5Wrap it with the insulation tape twice or more and position your contraction tube in the middle of the insulation tape. Three or more layers of insulation are required.

• Method 1

• Method 2

Insulation tape

Insulation tape

40mm35mm

6Apply heat to the contraction tube to contract it. Contraction tube

7After tube contraction work is completed, wrap it with the insulation tape to finish. Insulation tape

CAUTION

Make sure that the connection parts are not exposed to outside.

Be sure to use insulation tape and a contraction tube made of approved reinforced insulating materials that have the same level of withstand voltage with the power cable. (Comply with the local regulations on extensions.)

WARNING

In case of extending the electric wire, please DO NOT use a round-shaped pressing socket. ––Incomplete wire connections can cause electric shock or a fire.

INSTALLATION PARTS

English 75

Image 75
Contents Air conditioner Contents Safety precautions For Installation Using Parts For Power Supply Using Parts Safety precautions Using Parts For Cleaning Checking before use Using outdoor unitChecking the auxiliary power switch Operational temperature and humidity rangeViewing the parts Main partsTo open the panel Control panel and the display Locking the control panelUsing the air conditioner with the control panel Remote controller button Checking the remote controllerInserting the batteries Remote controller displayStoring the remote controller Battery changing timeDry Basic operationCool AutoAdjusting the air flow direction Using the Turbo function Setting the On timer Timer functionSetting the Off timer Cleaning and maintaining the air conditioner Cleaning the indoor unitCleaning the outdoor unit heat exchanger Cleaning the air filter Maintaining the air conditioner Periodical checks Problem Solution TroubleshootingTroubleshooting General information Power supply line, fuse or circuit breaker Installing the unitInstallation Parts Accessory parts list Preparation for installation Indoor  outdoor unit type and combinationMoving the outdoor unit Indoor unit Deciding on where to install the productOutdoor unit Deciding on where to install the product Space requirements Installation location 2000 Or more 300 or More 1500 or Or 600 or more more Or more Pipe length between the indoor and the outdoor unit Less than 30mDrilling a hole in the wall Installing Outdoor unit Installing indoor unitBase ground contruction Installation Parts Installation Parts Refrigerant piping work Connecting the pipesFix the pipe on Indoor Pipe connection Selecting refrigerant pipeTemper grade and minimum thickness of the refrigerant pipe Storing refrigerant pipe Cutting or flaring the pipes Direction of the pipe when brazingTightening flare connection part Pipe bending Connecting the drain hoseInsulating refrigerant pipe Selecting the insulator of the refrigerant pipeAllowable refrigerant pipe length Refrigerant chargingHow to add refrigerant Electrical work Wiring workPower supply and wire specification Phase 4 wires Power wiring diagramEarth Connecting power and communication cableSelecting solderless ring terminal Connecting the power terminal Connect the ring terminal Fixing the power cableGrounding work Installing grounding wire Wiring work Gas leak test and vacuum drying Check lists after completing the installation Testing operations SEG2 SEG3 SEG4 On on Check electrical connection and setting E441 IPM Installationparts How to connect your extended power cables Installation Parts Packing and unpacking guide Packing the indoor unit Unpacking the indoor unitPacking the outdoor unit Unpacking the outdoor unitCooling Questions or COMMENTS?