Samsung AF0AKV3SAEENSG manual SEG2 SEG3 SEG4

Page 68

INSTALLATION PARTS

Testing operations

Short

Display contents

SEG1

 

SEG2

SEG3

SEG4

Unit

push

 

1

Order frequency

1

Hundreds' digit

Tens' digit

Unit digit

Hz

2

Current frequency

2

Hundreds' digit

Tens' digit

Unit digit

Hz

3

The number of

3

Hundreds' digit

Tens' digit

Unit digit

EA

current indoor units

 

 

 

 

 

 

 

 

4

The sensor for

4

+ / -

 

 

Tens' digit

Unit digit

°C

outdoor air intake

 

 

 

 

 

 

 

 

 

 

5

Discharge sensor

5

Hundreds' digit

Tens' digit

Unit digit

°C

6

Eva-Mid sensor

6

+ / -

 

 

Tens' digit

Unit digit

°C

7

Cond sensor

7

+ / -

 

 

Tens' digit

Unit digit

°C

 

 

 

 

 

 

 

The first

 

8

Current

8

Tens' digit

Unit digit

place of

A

 

 

 

 

 

 

 

decimals

 

9

Fan RPM

9

Thousands' digit

Hundreds' digit

Tens' digit

rpm

10

Target discharge

A

Hundreds' digit

Tens' digit

Unit digit

°C

temperature

11

EEV

B

16kW

 

Hundreds' digit

Tens' digit

Unit digit

step

 

 

 

 

 

18/20/

Thousands'

Hundreds' digit

Tens' digit

 

 

 

 

 

 

 

25kW

 

digit

 

 

 

 

The capacity sum

 

 

 

 

 

The first

 

12

C

Tens' digit

Unit digit

place of

kW

of indoor units

 

 

 

 

 

 

 

decimals

 

 

 

 

 

 

 

Protective control

Frequency

 

 

 

 

 

 

 

0: No Protective control

status

 

 

 

 

 

 

 

1: Freezing

0: Normal

 

13

Protective control

D

0: Cooling

1: Hold

-

2: Non-stop defrosting

 

 

 

 

 

 

3: Over-load

2: Down

 

 

 

 

 

 

 

3: Up_limit

 

 

 

 

 

 

 

4: Discharge

 

 

 

 

 

 

 

4: Down_limit

 

 

 

 

 

 

 

5: Total electric current

 

14

The temperature of

E

Hundreds' digit

Tens' digit

Unit digit

-

heat radiating plate

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

15

S/W check

F

-

 

 

-

-

-

Long push 1

Main micom version

Year (Hex)

Month

Date

Date

(Hex)

(Tens' digit)

(Unit digit)

After short push 1

Inverter micom version

Year (Hex)

Month

Date

Date

Year (Dec)

(Hex)

(Tens' digit)

(Unit digit)

After short push 1

Fan1 version

Year (Dec)

Month

Date

Date

 

 

 

(Hex)

(Tens' digit)

(Unit digit)

After short push 1

Fan2 version

Year (Dec)

Month

Date

Date

 

 

 

(Hex)

(Tens' digit)

(Unit digit)

After short push 1

E2P version

Year (Hex)

Month

Date

Date

Year (Dec)

(Hex)

(Tens' digit)

(Unit digit)

 

 

Long push K4(Main micom ver.) → short push 1 more(Inv. micom ver.) → short push 1 more(E2P. ver.)

68English

Image 68
Contents Air conditioner Contents Safety precautions For Installation Using Parts For Power Supply Using Parts Safety precautions Using Parts For Cleaning Using outdoor unit Checking the auxiliary power switchOperational temperature and humidity range Checking before useTo open the panel Viewing the partsMain parts Locking the control panel Control panel and the displayUsing the air conditioner with the control panel Checking the remote controller Remote controller buttonRemote controller display Inserting the batteriesBattery changing time Storing the remote controllerBasic operation CoolAuto DryAdjusting the air flow direction Using the Turbo function Timer function Setting the On timerSetting the Off timer Cleaning the outdoor unit heat exchanger Cleaning and maintaining the air conditionerCleaning the indoor unit Cleaning the air filter Maintaining the air conditioner Periodical checks Troubleshooting Problem SolutionTroubleshooting General information Installing the unit Power supply line, fuse or circuit breakerInstallation Parts Accessory parts list Moving the outdoor unit Preparation for installationIndoor  outdoor unit type and combination Deciding on where to install the product Indoor unitOutdoor unit Deciding on where to install the product Space requirements Installation location 2000 Or more 300 or More 1500 or Or 600 or more more Or more Drilling a hole in the wall Pipe length between the indoor and the outdoor unitLess than 30m Installing indoor unit Installing Outdoor unitBase ground contruction Installation Parts Installation Parts Connecting the pipes Refrigerant piping workFix the pipe on Indoor Temper grade and minimum thickness of the refrigerant pipe Pipe connectionSelecting refrigerant pipe Storing refrigerant pipe Direction of the pipe when brazing Cutting or flaring the pipesTightening flare connection part Connecting the drain hose Pipe bendingSelecting the insulator of the refrigerant pipe Insulating refrigerant pipeRefrigerant charging Allowable refrigerant pipe lengthHow to add refrigerant Wiring work Electrical workPower supply and wire specification Power wiring diagram Phase 4 wiresConnecting power and communication cable EarthSelecting solderless ring terminal Connecting the power terminal Fixing the power cable Connect the ring terminalGrounding work Installing grounding wire Wiring work Gas leak test and vacuum drying Check lists after completing the installation Testing operations SEG2 SEG3 SEG4 On on Check electrical connection and setting E441 IPM Installationparts How to connect your extended power cables Installation Parts Packing and unpacking guide Unpacking the indoor unit Packing the indoor unitUnpacking the outdoor unit Packing the outdoor unitCooling Questions or COMMENTS?