The machine shall be installed on the ground or on the high platform
•As shown in Figure 1, to ensure the shadow part is on the bearing surface without suspension.
•As shown in Figure 1, the four installation footings shall be firmly fastened on the base platform by the bolts (preparing four sets of M10 bolts with fitful nuts and washer which are used on site)
•In order to reduce the vibration of the noisemeter, the vibration absorber (offer on site) shall be used between the contact of machine and base platform.
•It is optimal that anchor bolt is 20mm above the surface. (See Figure 2)
The base of the outdoor unit and the position of foundation bolts |
|
Position of the foundation bolts (Ø12.0 Hole 4Points) | Unit : mm |
| >100 |
|
| Bearing surface |
|
| 103.2 |
|
| 464 | 520 |
| 620 |
|
>90 | >90 |
|
↕20
Ground plane
Figure 1 | Figure 2 |
•Please ensure the shadow part in Figure 1 is really installed on the bearing surface without any suspension.
•The ground base that is larger than the standing leg of the
•The base platform shall be at least 150mm above the ground.
CAUTION
• When the grounding pipe comes out from the below, please reserve the place for the connection pipe.
• The installation mode mentioned above shall ensure that the shadow part in Figure 1 is really on the installation surface.
INSTALLATION PARTS
English 45