Quadra-Fire CB1200I CB1200-I Pellet Insert Outside Air Kit Instructions, Grille Installation

Page 20

CB1200-I Pellet Insert

R

B. Outside Air Kit Instructions

Parts Included in Kit: 1 piece of 2 inch x 3 ft. flex hose, 1 hose clamp and 1 rodent screen.

Tools Needed: Phillips head screw driver; wire cutters; hole saw or jig saw.

1.Measure distance from floor to air vent opening in appli- ance and mark location on wall.

2.Use saw to cut opening in wall. Cut a 2-1/2 to 3 inches (64-76mm) opening on inside wall and a 3 to 3-1/2 inch

(76-89mm) opening on outside of house.

3.Use hose clamp to secure flex pipe to collar assembly.

4.Slide trim ring over flex pipe and run pipe through wall.

5.Attach hose to outside termination cap with second hose clamp.

6.Secure termination cap to outside surface.

7.Secure trim ring to interior wall.

CAUTION

Never draw outside combustion air from:

Wall, floor or ceiling cavity

Enclosed space such as an attic or garage

Attach hose clamp to

Outside air

intake air collar

flex pipe

Figure 20.1

C. Adjustable Hopper Options

Depending on your installation, the hopper can be vertically adjusted up to a maximum of 3-1/2 inches (89mm) and will hold an additional 15 lbs of fuel.

To adjust hopper:

1.Using a Phillips head screw drive, remove all the screws from the top of the hopper securing the top hopper piece to the bottom hopper piece and insert body.

2.Adjust upward a maximum of 3-1/2 inches (89mm).

3.Mark location for new holes and drill new holes.

4.Secure hopper pieces together using screws removed in step one.

5.See drawing on page 8, Figure 8.3.

D.Grille Installation

1.Remove grille from packaging.

2.Lift top up.

3.Align the 3 holes in the insert with the holes in the grille.

4.Use a Phillips screw driver to secure in place. It will be necessary to go through the hole in the bag support shelf to gain access to the screw. Figure 20.3.

5.Lower the top into position.

Bag Support Shelf

Figure 20.3

 

Trim Ring

 

Flex Hose

 

Hose Clamp

Collar

Hose Clamp

Assembly

 

 

Termination

 

Cap Assembly

Figure 20.2

Page 20

7014-188B

February 3, 2010

Image 20
Contents CB1200MI-MBK Hot glass will cause burnsCB1200-I Pellet Insert Welcome to the Quadra-Fire FamilyTable of Contents Appliance Certification BTU & Efficiency Specifications Glass SpecificationsListing and Code Approvals Mobile Home ApprovedDesign, Installation & Location Consider- ations Appliance LocationCB1200-I Pellet Insert Locating Your Appliance & Chimney Negative PressureThermostat Location DraftInspect Appliance & Components and Pre-Use Check List CB1200-I Pellet Insert Fire SafetyTools And Supplies Needed 3Dimensions and Clearances Appliance DimensionsInch 0mm Clearance to Exposed Section and Face Trim Rear Shroud Kit is Required for Built-In InstallationShown with Rear Vent and Optional Outside Air Zero Clearance Installations Non-Zero Clearance InstallationsFloor Protection Inches MillimetersThermal Conductivity k value Thermal Resistance R valueConverting k to R Converting R to kAltering the Factory-Built Fireplace S629M, Standard for 650oC FACTORY-BUILT ChimneysVenting Termination Requirements Vent InformationChimney and Exhaust Connection Example of 3 Elbow-Rear Vent Termination Calculation Pipe Selection ChartCB1200-I Pellet Insert Equivalent Feet of Pipe Venting Systems Full Reline With Outside Air HorizontalCB1200-I Pellet Insert Full Reline With Outside Air Vertical Mobile Home Rear Shroud Installation 7Appliance Set-UpRear Vent Installation Preparation Installing Rear ShroudFor Top Vent Installation Attaching Shroud to Hopper BodyAdjustable Hopper Options Grille InstallationTo adjust hopper CB1200-I Pellet Insert Outside Air Kit InstructionsAdjustable Hearth Support Size 9D x 45W, 2 to 10 Height AdjustmentCB1200-I Pellet Insert Panel and Trim Set CB1200-I Pellet Insert Panel and Trim Set Cont’d Completed ViewCB1200-I Pellet Insert Optional Brick Set Installation Brick Clip InstallationThermostat Installation Top Log, LeftRight Front Log8Operating Instructions Fuel Size, Material and StorageWood Pellets Shelled Field Corn Cont’d Shelled Field CornCB1200-I Pellet Insert General Operating Information Before Your First FireStarting Your First Fire Thermostat Calls For HeatIgnition Cycles CB1200-I Pellet Insert Fire CharacteristicsFeed Rate Adjustment Instructions CB1200-I Pellet Insert Frequently Asked Questions Issues SolutionsTroubleshooting SymptomTroubleshooting Cont’d Symptom Possible Cause Corrective ActionTroubleshooting Cont’d 10Proper Shutdown Procedure Quick Reference Maintenance ChartMaintaining & Servicing Your Appliance Types of FuelCleaning Firepot with Cleaning Rod & Firepot Clean-Out Tool Cleaning Ash PanCleaning the Hopper See Disposal of Ashes Frequency As neededCleaning Heat Exchanger Chambers & Drop Tube Cleaning Beneath Heat ExchangerCleaning Exhaust Path Cleaning the GlassPreparing Firebox for Non-Burn Season Frequency Yearly Cleaning Exhaust Blower Requires No LubricationDoor Gasket Inspection CB1200-I Pellet Insert High Ash Fuel Content Maintenance Immediate Attention and Cleaning is RequiredBefore removing the side frame. Use a pow Ered Phillips head screw driver to remove ScrewsIgniter Replacement Baffle Removal Component Function Reference MaterialsCB 200-I Pellet Insert Vacuum Switch Wiring Harness See .1 belowThermostat Snap Disc #1 Convection Blower 125FCB1200-I Pellet Insert Component Locations Control BoxCB1200-I Pellet Insert Exploded Drawing CB1200-I Pellet Insert Service Parts and Accessories Important this is Dated Information HOW to OrderStocked At Depot Description Comments Part Number DR-CB12-NL-BStocked Description Comments Part NumberCB1200-I Pellet Insert Fasteners Stocked at DepotCB1200-I Pellet Insert Service And Maintenance Log Date of Service Performed By Description of ServiceCB1200-I Pellet Insert Warranty Policy CB1200-I Pellet Insert Contact Information