Quadra-Fire CB1200MI-MBK CB1200-I Pellet Insert Panel and Trim Set Cont’d, Completed View

Page 23

R

CB1200-I Pellet Insert

F. Panel and Trim Set (Cont’d)

5.Hold side curtains in open position and lower panel set over insert setting lower edge of top panel in slot between hopper lid and panel support as shown in Figure 23.1. Place existing screw head (installed in Figure 23.2) into locator hole in floor of insert. Figure 23.2.

6.Lift hopper lid and press down on panel top while installing

(4) 8-32 x 3/8 inch screws into holes in panel support. (If screws have been factory installed, tighten to secure panel to panel support.) Return hopper lid to closed position.

7.Install a corner bracket on each side trim piece. Slide brackets into top trim from each side and secure with flathead screwdriver. Attach trim assembly to panel set as follows:

a. Ensure that brackets face towards the back.

b. Align trim assembly to panel set sides and slide down.

Figure 23.1

Panel Locator Hole

Figure 23.2

Figure 23.3

View of "L" Bracket

installed

Figure 23.4

Figure 23.5- Completed View

February 3, 2010

7014-188B

Page 23

Image 23
Contents Hot glass will cause burns CB1200MI-MBKWelcome to the Quadra-Fire Family CB1200-I Pellet InsertTable of Contents Mobile Home Approved Appliance Certification BTU & Efficiency SpecificationsGlass Specifications Listing and Code ApprovalsAppliance Location Design, Installation & Location Consider- ationsDraft CB1200-I Pellet Insert Locating Your Appliance & ChimneyNegative Pressure Thermostat LocationInspect Appliance & Components and Pre-Use Check List CB1200-I Pellet Insert Fire SafetyTools And Supplies Needed Appliance Dimensions 3Dimensions and ClearancesInch 0mm Clearance to Exposed Section and Face Trim Rear Shroud Kit is Required for Built-In InstallationShown with Rear Vent and Optional Outside Air Inches Millimeters Zero Clearance InstallationsNon-Zero Clearance Installations Floor ProtectionConverting R to k Thermal Conductivity k valueThermal Resistance R value Converting k to RS629M, Standard for 650oC FACTORY-BUILT Chimneys Altering the Factory-Built FireplaceVenting Termination Requirements Vent InformationChimney and Exhaust Connection Example of 3 Elbow-Rear Vent Termination Calculation Pipe Selection ChartCB1200-I Pellet Insert Equivalent Feet of Pipe Full Reline With Outside Air Horizontal Venting SystemsCB1200-I Pellet Insert Full Reline With Outside Air Vertical Mobile Home 7Appliance Set-Up Rear Shroud InstallationAttaching Shroud to Hopper Body Rear Vent Installation PreparationInstalling Rear Shroud For Top Vent InstallationCB1200-I Pellet Insert Outside Air Kit Instructions Adjustable Hopper OptionsGrille Installation To adjust hopperSize 9D x 45W, 2 to 10 Height Adjustment Adjustable Hearth SupportCB1200-I Pellet Insert Panel and Trim Set Completed View CB1200-I Pellet Insert Panel and Trim Set Cont’dBrick Clip Installation CB1200-I Pellet Insert Optional Brick Set InstallationFront Log Thermostat InstallationTop Log, Left RightShelled Field Corn 8Operating InstructionsFuel Size, Material and Storage Wood Pellets Shelled Field Corn Cont’dThermostat Calls For Heat CB1200-I Pellet Insert General Operating InformationBefore Your First Fire Starting Your First FireIgnition Cycles CB1200-I Pellet Insert Fire CharacteristicsFeed Rate Adjustment Instructions Issues Solutions CB1200-I Pellet Insert Frequently Asked QuestionsSymptom TroubleshootingSymptom Possible Cause Corrective Action Troubleshooting Cont’dTroubleshooting Cont’d Types of Fuel 10Proper Shutdown ProcedureQuick Reference Maintenance Chart Maintaining & Servicing Your ApplianceSee Disposal of Ashes Frequency As needed Cleaning Firepot with Cleaning Rod & Firepot Clean-Out ToolCleaning Ash Pan Cleaning the HopperCleaning the Glass Cleaning Heat Exchanger Chambers & Drop TubeCleaning Beneath Heat Exchanger Cleaning Exhaust PathPreparing Firebox for Non-Burn Season Frequency Yearly Cleaning Exhaust Blower Requires No LubricationDoor Gasket Inspection Immediate Attention and Cleaning is Required CB1200-I Pellet Insert High Ash Fuel Content MaintenanceEred Phillips head screw driver to remove Screws Before removing the side frame. Use a powIgniter Replacement Baffle Removal Component Function Reference MaterialsCB 200-I Pellet Insert Snap Disc #1 Convection Blower 125F Vacuum SwitchWiring Harness See .1 below ThermostatControl Box CB1200-I Pellet Insert Component LocationsCB1200-I Pellet Insert Exploded Drawing Important this is Dated Information HOW to Order CB1200-I Pellet Insert Service Parts and AccessoriesDR-CB12-NL-B Stocked At Depot Description Comments Part NumberDescription Comments Part Number StockedCB1200-I Pellet Insert Stocked at Depot FastenersDate of Service Performed By Description of Service CB1200-I Pellet Insert Service And Maintenance LogCB1200-I Pellet Insert Warranty Policy CB1200-I Pellet Insert Contact Information