Quadra-Fire CB1200I, CB1200MI-MBK owner manual 7Appliance Set-Up, Rear Shroud Installation

Page 18

CB1200-I Pellet Insert

7Appliance Set-Up

R

A.Rear Shroud Installation

1.Top Vent Installations

Parts Required:

Part 811-0680, Rear Shroud Kit.

Includes: Six galvanized steel shroud pieces, two cover plates and fastener package.

Part 811-0650, Rear Shroud Top Vent

Includes: Vent pipe and two 1/4 - 20 x 3/4 inch bolts with nuts.

Part 811-0660, 3 inch Top Vent Adapter or Part 811-0670, 4 inch Top Vent Adapter

2.Rear vent installations Parts Required:

Part 811-0680, Rear Shroud Kit. Part 811-0690, Rear Vent Kit

 

 

 

 

 

REAR SHROUD TOP

 

 

 

 

VENT PART 811-0650

 

 

 

 

 

 

Right Corner

Top Vent Opening

Left Corner

 

 

 

 

 

 

 

Left

Corner

 

 

Piece

 

Filler

 

 

 

-Out

Rear

Knock

Access

Vent

 

 

 

 

 

 

Outside

Air

Vent

 

 

 

 

 

Pipe

Access

 

 

 

 

 

Includes: Rear Vent Adapter and fastener package.

Tools Required:

Figure 18.1

Electric drill, 1/8 inch drill bit, Phillips screw driver, 3/8 inch wrench & 7/16 inch wrench, (7/16 inch socket wrench & high temperature silicone adhesive are also required for rear vent installations).

Complete the following procedures, based on your venting installation, prior to installing the rear shroud kit. (Note: All photos depict top vent installation).

Top Vent Installation Preparation

Filler Piece

Figure 18.2

Rear Shroud

Top Vent

Figure 18.3

1.Remove the top vent adapter from the vertical exhaust transition pipe. Figures 18.2 and 18.5.

2.Use 2 screws to attach left corner filler piece of rear shroud to the insert hopper. Figures 18.1 and 18.2.

3.Use (2) 1/4 - 20 x 3/4 inch bolts with nuts to install rear shroud top vent to the exhaust transition. See boxed area in Figure 18.3. (Circled area, top vent adapter, will be installed later).

4.Install the left shroud panel corner at 3 points, 2 screws into back of hopper and 1 down into the filler piece).

Figure 18.4

Left Corner

Piece

Figure 18.4

Vertical Exhaust

Transition Pipe

Top Vent Adapter

Figure 18.5

Page 18

7014-188B

February 3, 2010

Image 18
Contents CB1200MI-MBK Hot glass will cause burnsCB1200-I Pellet Insert Welcome to the Quadra-Fire FamilyTable of Contents Listing and Code Approvals Appliance Certification BTU & Efficiency SpecificationsGlass Specifications Mobile Home ApprovedDesign, Installation & Location Consider- ations Appliance LocationThermostat Location CB1200-I Pellet Insert Locating Your Appliance & ChimneyNegative Pressure DraftCB1200-I Pellet Insert Fire Safety Tools And Supplies NeededInspect Appliance & Components and Pre-Use Check List 3Dimensions and Clearances Appliance DimensionsRear Shroud Kit is Required for Built-In Installation Shown with Rear Vent and Optional Outside AirInch 0mm Clearance to Exposed Section and Face Trim Floor Protection Zero Clearance InstallationsNon-Zero Clearance Installations Inches MillimetersConverting k to R Thermal Conductivity k valueThermal Resistance R value Converting R to kAltering the Factory-Built Fireplace S629M, Standard for 650oC FACTORY-BUILT ChimneysVent Information Chimney and Exhaust ConnectionVenting Termination Requirements Pipe Selection Chart CB1200-I Pellet Insert Equivalent Feet of PipeExample of 3 Elbow-Rear Vent Termination Calculation Venting Systems Full Reline With Outside Air HorizontalCB1200-I Pellet Insert Full Reline With Outside Air Vertical Mobile Home Rear Shroud Installation 7Appliance Set-UpFor Top Vent Installation Rear Vent Installation PreparationInstalling Rear Shroud Attaching Shroud to Hopper BodyTo adjust hopper Adjustable Hopper OptionsGrille Installation CB1200-I Pellet Insert Outside Air Kit InstructionsAdjustable Hearth Support Size 9D x 45W, 2 to 10 Height AdjustmentCB1200-I Pellet Insert Panel and Trim Set CB1200-I Pellet Insert Panel and Trim Set Cont’d Completed ViewCB1200-I Pellet Insert Optional Brick Set Installation Brick Clip InstallationRight Thermostat InstallationTop Log, Left Front LogWood Pellets Shelled Field Corn Cont’d 8Operating InstructionsFuel Size, Material and Storage Shelled Field CornStarting Your First Fire CB1200-I Pellet Insert General Operating InformationBefore Your First Fire Thermostat Calls For HeatCB1200-I Pellet Insert Fire Characteristics Feed Rate Adjustment InstructionsIgnition Cycles CB1200-I Pellet Insert Frequently Asked Questions Issues SolutionsTroubleshooting SymptomTroubleshooting Cont’d Symptom Possible Cause Corrective ActionTroubleshooting Cont’d Maintaining & Servicing Your Appliance 10Proper Shutdown ProcedureQuick Reference Maintenance Chart Types of FuelCleaning the Hopper Cleaning Firepot with Cleaning Rod & Firepot Clean-Out ToolCleaning Ash Pan See Disposal of Ashes Frequency As neededCleaning Exhaust Path Cleaning Heat Exchanger Chambers & Drop TubeCleaning Beneath Heat Exchanger Cleaning the GlassCleaning Exhaust Blower Requires No Lubrication Door Gasket InspectionPreparing Firebox for Non-Burn Season Frequency Yearly CB1200-I Pellet Insert High Ash Fuel Content Maintenance Immediate Attention and Cleaning is RequiredBefore removing the side frame. Use a pow Ered Phillips head screw driver to remove ScrewsIgniter Replacement Baffle Removal Reference Materials CB 200-I Pellet InsertComponent Function Thermostat Vacuum SwitchWiring Harness See .1 below Snap Disc #1 Convection Blower 125FCB1200-I Pellet Insert Component Locations Control BoxCB1200-I Pellet Insert Exploded Drawing CB1200-I Pellet Insert Service Parts and Accessories Important this is Dated Information HOW to OrderStocked At Depot Description Comments Part Number DR-CB12-NL-BStocked Description Comments Part NumberCB1200-I Pellet Insert Fasteners Stocked at DepotCB1200-I Pellet Insert Service And Maintenance Log Date of Service Performed By Description of ServiceCB1200-I Pellet Insert Warranty Policy CB1200-I Pellet Insert Contact Information