Gas-Fired Products PTU Series, PTS Series manual Installation and Operation Instructions

Page 1

INSTALLATION AND OPERATION INSTRUCTIONS

OWNER / INSTALLER: For your safety this manual must be carefully and thoroughly read and understood before installing, operating or servicing this heater.

INFRARED RADIANT TUBE HEATER

Single Stage Push Through System (Positive Pressure)

 

Models:

PTS SERIES:

(40, 50, 75, 100, 125, 150, 175, 200) – N5/L5

PTU SERIES:

(40, 50, 75, 100, 125, 150, 175, 200) – N5/L5

￿INSTALLER: This manual is the property of the owner. Please present this manual to the owner when you leave the job site.

WARNING: Improper installation, adjustment, alteration, service, or maintenance can cause property damage, injury or death. Read the installation, operation and maintenance instructions thoroughly before installing or servicing this equipment.

￿

IF YOU SMELL GAS:

FOR YOUR SAFETY

 

 

￿DO NOT try to light any appliance.

￿DO NOT touch any electrical switch; DO NOT use any telephone in your building.

￿IMMEDIATELY call your gas supplier from a neighbor's telephone. Follow the gas supplier's instructions. If you cannot reach your gas supplier, call the fire department.

DO NOT store or use gasoline or other flammable vapors and liquids in the vicinity of this or any other appliance.

!IMPORTANT: SAVE THIS MANUAL FOR FUTURE REFERENCE.

SPACE-RAY

Post Office Box 36485 (28236) 305 Doggett Street (28203) Charlotte, North Carolina

Phone (704) 372-3485 Fax (704) 332-5843 www.spaceray.com email: info@spaceray.com

Form #43343330

May 08

Image 1
Contents Installation and Operation Instructions Table of Contents Installer Responsibility SafetyInstallation Requirements General InformationHigh Altitude For Canada onlyMinimum Clearances to Combustibles Minimum Clearances to CombustiblesPTS/PTU Packing List SpecificationsNatural GAS Burner Package NumbersPTU 40-200 Body Package Descriptions Reflector, 4’ 11 ½’ End Reflector Accessory Package AccessoriesExhaust Hood Package Emitter Length Body Length Model Typical Layouts PTU / PTS SeriesPoisonous GAS and Soot Hazard Typical Assembly LayoutPTS Series Dimensions PTU Series Joining of Tube Sections Heater AssemblyTypical Assembly Overview PTU 40FT Shown Suspension Hazard Typical Suspension MethodsCUT Hazard Assembly of Tube SectionsMIN 8’ MAX 10’ Between Hangers Assembly of Extension SectionInserting Turbulators Adding Reflectors Assembly HazardAdding Optional Corner Reflector PTS only Adding Optional 90º Elbow PTS onlyAdding Optional U-BEND Reflector PTU only Adding 180U-Bend PTU onlyAttaching Burner BOX Assembly Instructions Connecting the Tiss SystemEnd View Angle Mounted Heaters only Do not USE AN Open Flame of ANY Kind to Test for Leaks GAS Connections and RegulationsKEY Dimensions and Components of the GAS Connections Supply Pressure Instructions for Pressure Test Gauge ConnectionManifold Pressure Combination GAS Valve is Factory SET STEP-OPENING GAS Control Valve Electrical ConnectionsTH/W Ignition Module Terminal Designations 24VAC/RPS/W GNDLine Voltage 120V Thermostat Connections Multiple Heaters Line Voltage 120V Thermostat Connections Single HeaterLOW Voltage 24V Thermostat Connections Single Heaters Carbon Monoxide Hazard VentingSingle Heater Venting Horizontal Through Sidewall Single Heater Venting Vertical Through the Roof#10 Self-Drill Vent Pipe Screws PTS/PTU Common Vent Diameter Multiple Heater Vertical venting arrangementDirect Outside AIR for Combustion AIR for CombustionVertical Sequence of Operation Lighting and Shutdown InstructionsBurner Component Locations Electric Shock & Explosion Hazard Cleaning and MaintenanceTroubleshooting Guide Form Form #43343330 May Removal of Main Burner and Electrodes Replacing PartsAIR Switch Pressure Check Removal of GAS Valve and Manifold AssemblyTo Check Flame Sensor Circuit Ignition System ChecksIgnition Module Diagnostics Installation DataFasteners Replacement Parts Guide Burner BOXLabels/Manual 22c 22b 22a 40a 17a Description Body Components