Gas-Fired Products PTS Series, PTU Series manual PTU 40-200 Body Package Descriptions

Page 8

C) PTS 40-200 Series Body Package Descriptions – ALC Option (Aluminized Calorized)

(Package Part Number is indicated on the outside of carton.)

System Lengths

PTS Body Packages – Aluminized/Aluminized or

10 Ft. Pkg

20 Ft. Pkg

30 Ft. Pkg

40 Ft. Pkg

50 Ft. Pkg

 

Alumi-Therm/Aluminized

44134020

44135020

44136020

44137090

44138080

Part #

Each Body Package Includes:

Qty.

Qty.

Qty.

Qty.

Qty.

42912080

10 Ft. Tube with 24 Hole Flange (Aluminized)

1

1

1

-

-

42912169

10 Ft. Tube with 6 Hole Flange (Alumi-Therm)

-

-

-

1

1

41932100

10 Ft. Tube less Flanges (Aluminized)

-

1

2

3

4

43319100

Reflector, 9’ 11½”

1

2

3

4

5

30462980

Tube Coupling

-

1

2

3

4

43318000

Tube Hanger/Support Bracket, 13”

1

2

3

4

5

43980010

Wire Hanger

1

2

3

4

5

 

 

 

 

 

 

 

Body Fastener Kit (included in body packages)

42907280

42907190

42907200

42907210

42907220

42873000

U-Bolt

1

2

3

4

5

02127110

Hex Nut, 5/16-18

3

5

6

8

10

02189020

HWHSM Screw, #10-16 x ½” TEKS

4

8

10

14

18

 

 

 

 

60Ft. System

 

 

 

 

40 Ft. Pkg

20 Ft. Pkg

 

PTS Body Packages – Alumi-Therm/Aluminized

44137090

 

44135030

 

Part #

 

Each Body Package Includes:

Qty.

Qty.

42912169

 

10 Ft. Tube with 6 Hole Flange (Alumi-Therm)

1

 

-

41932100

 

10 Ft. Tube less Flanges (Aluminized)

3

 

2

43319100

 

Reflector, 9’ 11½”

4

 

2

30462980

 

Tube Coupling

3

 

1

43318000

 

Tube Hanger/Support Bracket, 13”

4

 

2

43980010

 

Wire Hanger

4

 

2

 

 

 

 

 

 

 

Body Fastener Kit (included in body packages)

42907210

 

42907190

 

42873000

 

U-Bolt

4

 

2

 

02127110

 

Hex Nut, 5/16-18

8

 

5

 

02189020

HWHSM Screw, #10-16 x ½” TEKS

14

 

8

70Ft. System

40 Ft. Pkg

30 Ft. Pkg

44137090

 

44136050

Qty.

Qty.

1

 

-

3

 

3

4

 

3

3

 

3

4

 

3

4

 

3

 

 

 

42907210

 

42907200

4

 

3

8

 

6

14

 

10

D) PTU 40-200 Body Package Descriptions

(Package Part Number is indicated on the outside of each corresponding carton.)

System Lengths

PTU Body Packages – Aluminized/Hot Rolled or

20 Ft. Pkg.

30 Ft. Pkg

40 Ft. Pkg

50 Ft. Pkg

 

 

Alumi-Therm/Hot Rolled

44135000

44136010

44137100

44138110

Part #

 

Each Body Package Includes:

Qty.

Qty.

Qty.

Qty.

42912080

10

Ft. Tube with 24 Hole Flange (Aluminized)

1

1

-

-

42912169

10

Ft. Tube with 6 Hole Flange (Alumi-Therm)

-

-

1

1

41932101

10

Ft. Tube less Flanges (Hot Rolled)

1

1

3

3

41932051

5 Ft. Tube less Flanges (Hot Rolled)

-

2

-

2

43319100

Reflector, 9’ 11½”

2

2

4

4

43319050

Reflector, 4’ 11 ½”

-

2

-

2

30462980

Tube Coupling

1

3

3

5

43318000

Tube Hanger/Support Bracket, 13”

2

4

4

6

43980010

Wire Hanger

2

4

4

6

Form #43343330

 

May 08

–7–

Image 8
Contents Installation and Operation Instructions Table of Contents Safety Installer ResponsibilityInstallation Requirements General InformationFor Canada only High AltitudePTS/PTU Minimum Clearances to CombustiblesMinimum Clearances to Combustibles Specifications Packing ListBurner Package Numbers Natural GASPTU 40-200 Body Package Descriptions Reflector, 4’ 11 ½’ Accessories End Reflector Accessory PackageExhaust Hood Package Typical Layouts PTU / PTS Series Emitter Length Body Length ModelTypical Assembly Layout Poisonous GAS and Soot HazardPTS Series Dimensions PTU Series Heater Assembly Joining of Tube SectionsTypical Assembly Overview PTU 40FT Shown Typical Suspension Methods Suspension HazardAssembly of Tube Sections CUT HazardAssembly of Extension Section MIN 8’ MAX 10’ Between HangersInserting Turbulators Assembly Hazard Adding ReflectorsAdding Optional 90º Elbow PTS only Adding Optional Corner Reflector PTS onlyAdding 180U-Bend PTU only Adding Optional U-BEND Reflector PTU onlyAttaching Burner BOX Assembly Connecting the Tiss System InstructionsEnd View Angle Mounted Heaters only GAS Connections and Regulations Do not USE AN Open Flame of ANY Kind to Test for LeaksKEY Dimensions and Components of the GAS Connections Manifold Pressure Combination GAS Valve is Factory SET Instructions for Pressure Test Gauge ConnectionSupply Pressure Electrical Connections STEP-OPENING GAS Control ValveIgnition Module Terminal Designations 24VAC/R TH/WPS/W GNDLOW Voltage 24V Thermostat Connections Single Heaters Line Voltage 120V Thermostat Connections Single HeaterLine Voltage 120V Thermostat Connections Multiple Heaters Venting Carbon Monoxide HazardSingle Heater Venting Vertical Through the Roof Single Heater Venting Horizontal Through Sidewall#10 Self-Drill Vent Pipe Screws Multiple Heater Vertical venting arrangement PTS/PTU Common Vent DiameterAIR for Combustion Direct Outside AIR for CombustionVertical Lighting and Shutdown Instructions Sequence of OperationBurner Component Locations Cleaning and Maintenance Electric Shock & Explosion HazardTroubleshooting Guide Form Form #43343330 May Replacing Parts Removal of Main Burner and ElectrodesRemoval of GAS Valve and Manifold Assembly AIR Switch Pressure CheckIgnition System Checks To Check Flame Sensor CircuitInstallation Data Ignition Module DiagnosticsReplacement Parts Guide Burner BOX FastenersLabels/Manual 22c 22b 22a 40a 17a Body Components Description