Gas-Fired Products PTU Series, PTS Series manual Adding Optional 90º Elbow PTS only

Page 23

11.0) ADDING OPTIONAL 90º ELBOW (PTS ONLY)

1.The optional 90º elbow must be located a minimum of 10 ft. after the control box.

2.Hang the body sections in a 90º ("L") shaped pattern. Allow spacing for the elbow. The distance from one end of the elbow to the centerline of the opposite leg is 13" as shown.

3.Join the tube ends of the body sections and the elbow together and secure with tube couplings as described in Section 10.1.

Tube

Coupling

90 Deg. Elbow

Self-Drilling Screws (QTY-2 per coupling)

13” (330mm)

13” (330mm)

11.1) ADDING OPTIONAL CORNER REFLECTOR (PTS ONLY)

1.Place the corner reflector over the reflectors of both body sections.

2.Secure by sliding speed clips on the reflector edges. One speed clip is required for each side of reflector.

3.The corner reflector can be used only when the long axis of the heater is level and mounted in a horizontal position.

Speed Clip (QTY-4)

Corner Reflector

 

Form #43343330

–22–

May 08

Image 23
Contents Installation and Operation Instructions Table of Contents General Information SafetyInstaller Responsibility Installation RequirementsHigh Altitude For Canada onlyPTS/PTU Minimum Clearances to CombustiblesMinimum Clearances to Combustibles Packing List SpecificationsNatural GAS Burner Package NumbersPTU 40-200 Body Package Descriptions Reflector, 4’ 11 ½’ End Reflector Accessory Package AccessoriesExhaust Hood Package Emitter Length Body Length Model Typical Layouts PTU / PTS SeriesPoisonous GAS and Soot Hazard Typical Assembly LayoutPTS Series Dimensions PTU Series Joining of Tube Sections Heater AssemblyTypical Assembly Overview PTU 40FT Shown Suspension Hazard Typical Suspension MethodsCUT Hazard Assembly of Tube SectionsMIN 8’ MAX 10’ Between Hangers Assembly of Extension SectionInserting Turbulators Adding Reflectors Assembly HazardAdding Optional Corner Reflector PTS only Adding Optional 90º Elbow PTS onlyAdding Optional U-BEND Reflector PTU only Adding 180U-Bend PTU onlyAttaching Burner BOX Assembly Instructions Connecting the Tiss SystemEnd View Angle Mounted Heaters only Do not USE AN Open Flame of ANY Kind to Test for Leaks GAS Connections and RegulationsKEY Dimensions and Components of the GAS Connections Manifold Pressure Combination GAS Valve is Factory SET Instructions for Pressure Test Gauge ConnectionSupply Pressure STEP-OPENING GAS Control Valve Electrical ConnectionsGND Ignition Module Terminal Designations 24VAC/RTH/W PS/WLOW Voltage 24V Thermostat Connections Single Heaters Line Voltage 120V Thermostat Connections Single HeaterLine Voltage 120V Thermostat Connections Multiple Heaters Carbon Monoxide Hazard VentingSingle Heater Venting Horizontal Through Sidewall Single Heater Venting Vertical Through the Roof#10 Self-Drill Vent Pipe Screws PTS/PTU Common Vent Diameter Multiple Heater Vertical venting arrangementDirect Outside AIR for Combustion AIR for CombustionVertical Sequence of Operation Lighting and Shutdown InstructionsBurner Component Locations Electric Shock & Explosion Hazard Cleaning and MaintenanceTroubleshooting Guide Form Form #43343330 May Removal of Main Burner and Electrodes Replacing PartsAIR Switch Pressure Check Removal of GAS Valve and Manifold AssemblyTo Check Flame Sensor Circuit Ignition System ChecksIgnition Module Diagnostics Installation DataFasteners Replacement Parts Guide Burner BOXLabels/Manual 22c 22b 22a 40a 17a Description Body Components