Gas-Fired Products PTU Series, PTS Series Typical Assembly Layout, Poisonous GAS and Soot Hazard

Page 13

above.

7.1) TYPICAL ASSEMBLY LAYOUT

POISONOUS GAS AND SOOT HAZARD

The heater must be assembled with the correct number of turbulator sections and tube length for the rated heat input.

The turbulator must be installed in the last tube section as shown.

Failure to do so may result in death, serious injury, property damage or illness from Carbon Monoxide poisoning.

10 FT. SYSTEM Stainless Steel Turbulator closest to burner PTS / U 40 only.

20 FT. SYSTEM

30 FT. SYSTEM

40 FT. SYSTEM

50 FT. SYSTEM

60 FT. SYSTEM

70 FT. SYSTEM

 

2 Ft. Turbulator

MODEL

Sections

PTS/U 40

4

PTS/U 50

5

PTS/U 75

5

PTS/U 100

3

PTS/U 125

7

PTS/U 150

4

PTS/U 175

0

PTS/U 200

1

LEGEND

Burner Box 10ft Aluminized Tube 24 Coupling

10ft Aluminized or HRS

2ft Stainless

2ft Aluminized

Hole Flange

Tube model dependent

Steel

Steel

or

 

Turbulator

Turbulator

10ft Alumi-Therm Tube

 

sections

sections

6 Hole Flange

 

 

 

 

Form #43343330

–12–

May 08

Image 13
Contents Installation and Operation Instructions Table of Contents Installer Responsibility SafetyInstallation Requirements General InformationHigh Altitude For Canada onlyMinimum Clearances to Combustibles Minimum Clearances to CombustiblesPTS/PTU Packing List SpecificationsNatural GAS Burner Package NumbersPTU 40-200 Body Package Descriptions Reflector, 4’ 11 ½’ End Reflector Accessory Package AccessoriesExhaust Hood Package Emitter Length Body Length Model Typical Layouts PTU / PTS SeriesPoisonous GAS and Soot Hazard Typical Assembly LayoutPTS Series Dimensions PTU Series Joining of Tube Sections Heater AssemblyTypical Assembly Overview PTU 40FT Shown Suspension Hazard Typical Suspension MethodsCUT Hazard Assembly of Tube SectionsMIN 8’ MAX 10’ Between Hangers Assembly of Extension SectionInserting Turbulators Adding Reflectors Assembly HazardAdding Optional Corner Reflector PTS only Adding Optional 90º Elbow PTS onlyAdding Optional U-BEND Reflector PTU only Adding 180U-Bend PTU onlyAttaching Burner BOX Assembly Instructions Connecting the Tiss SystemEnd View Angle Mounted Heaters only Do not USE AN Open Flame of ANY Kind to Test for Leaks GAS Connections and RegulationsKEY Dimensions and Components of the GAS Connections Supply Pressure Instructions for Pressure Test Gauge ConnectionManifold Pressure Combination GAS Valve is Factory SET STEP-OPENING GAS Control Valve Electrical ConnectionsTH/W Ignition Module Terminal Designations 24VAC/RPS/W GNDLine Voltage 120V Thermostat Connections Multiple Heaters Line Voltage 120V Thermostat Connections Single HeaterLOW Voltage 24V Thermostat Connections Single Heaters Carbon Monoxide Hazard VentingSingle Heater Venting Horizontal Through Sidewall Single Heater Venting Vertical Through the Roof#10 Self-Drill Vent Pipe Screws PTS/PTU Common Vent Diameter Multiple Heater Vertical venting arrangementDirect Outside AIR for Combustion AIR for CombustionVertical Sequence of Operation Lighting and Shutdown InstructionsBurner Component Locations Electric Shock & Explosion Hazard Cleaning and MaintenanceTroubleshooting Guide Form Form #43343330 May Removal of Main Burner and Electrodes Replacing PartsAIR Switch Pressure Check Removal of GAS Valve and Manifold AssemblyTo Check Flame Sensor Circuit Ignition System ChecksIgnition Module Diagnostics Installation DataFasteners Replacement Parts Guide Burner BOXLabels/Manual 22c 22b 22a 40a 17a Description Body Components