
Form #43343330 May 08
Typical Assembly Overview
(PTS 40FT Shown)
Turbulator
(See specifications section 5 for required quantities.)
Typical
Overlap
Flue
Terminal
8.2) HEATER ASSEMBLY
| 
 | 
 | 
 | |
| 
 | 
 | 
 | 5/16" Hex Nuts | 
| 
 | 
 | 4"OD x 10Ft. Tube | 
 | 
| 
 | 
 | See section 7 | 
 | 
| 
 | 
 | for required tubes. | 
 | 
| 
 | Mounting Flange | 8’ - 10’ | |
| 
 | 24 Hole for Aluminized Steel Tubes | ||
| 
 | 
 | ||
| Burner | 
 | 6 Hole for  | |
| 
 | 8’ - 9’ ¼” | 
 | |
| Box | Gasket | 
 | |
Maximum 6” distance from burner box to the tube support/hanger bracket.
Wire Hanger
Tube Support Bracket
Tube Coupling
(Typical each tube joint.) 8’ - 10’
#10 
Not Less
Than 10”
/ JOINING OF TUBE SECTIONS
Burner Box
Suspension
Chain
5 hanging points to be used for suspension for a typical 40ft long system. There must be two hanging points on the first tube and one on each of the other tubes