Wayne-Dalton 3663-372 Pre-Operation, Mounting Wall Station, Installing Battery

Models: 3663-372

1 52
Download 52 pages 50.34 Kb
Page 29
Image 29
Installing Battery

 

Mounting Wall Station

Lower Screw Installation

 

Upper Screw Installation

 

 

 

 

 

 

 

 

 

 

 

(Continued)

 

 

 

 

 

 

 

 

 

 

 

If mounting to a NEMA electrical device box,

 

 

 

 

 

 

 

use machine thread screws provided in

 

 

 

 

 

 

 

place of the wood screws. No drilling is

 

 

 

 

 

 

 

required. If high voltage wiring is contained

 

 

 

 

 

 

 

in the box, a standard NEMA solid faceplate

 

 

 

 

 

 

 

must be installed between the box and the

 

 

 

 

 

 

 

wall station. If fastening into drywall or

 

 

 

 

 

 

 

concrete, use anchors provided. When

 

 

 

 

 

 

 

mounting to wood use a 3/32" drill bit and

 

 

 

 

Phillips

 

the drilling template located on page 44.

 

 

 

 

 

 

 

 

Head Screw

 

Drill the two 3/32” mounting holes using the

 

 

 

 

 

 

 

drill template. Drill 3/16" holes if using

 

 

 

 

 

 

 

anchors.

 

 

 

 

 

 

 

Install lower screw leaving 7/16" of the

 

 

 

 

 

 

 

screw exposed. Slide wall station keyhole

 

 

 

 

 

 

 

slot onto the lower phillips head screw. Wall

 

7/16”

 

 

 

 

 

station should slide onto screw, providing a

 

 

 

 

 

 

 

snug fit. If necessary remove wall station

 

 

 

 

 

 

 

and loosen or tighten lower phillips head

 

 

 

Keyhole

 

 

 

screw until a snug fit is achieved.

 

 

 

Slot

 

 

 

 

 

 

 

 

 

 

Once wall station is fitted on lower screw,

 

 

 

Phillips

 

 

 

install upper screw. Do not over-tighten.

 

 

 

 

 

 

 

 

 

 

Head Screw

 

 

 

CAUTION: OVER-TIGHTENING THE UPPER

 

 

 

 

 

 

 

SCREW COULD DEFORM PLASTIC CASE.

 

 

 

 

 

 

15

Installing Battery

 

per

 

 

 

 

 

 

 

 

 

 

 

 

 

O

at

 

 

 

 

 

 

o

e

 

 

 

Tools Needed:

Remove the battery cover (right-hand side

 

T

 

 

 

LED

o

 

 

 

 

 

 

D

 

 

 

 

of wall station) by disengaging the battery

 

 

o

 

 

 

 

Press

 

 

 

None

 

 

Here

r

 

 

 

 

 

 

 

 

cover’s lower clip.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Install two AAA batteries into the wall

 

 

 

 

 

 

 

station observing the polarity, (+) and (-),

 

 

 

 

 

 

 

of both batteries. After about three seconds,

Wall

 

 

 

 

 

 

the red LED will begin to blink momentarily

 

 

 

 

 

 

Station

 

 

 

 

 

every three seconds.

 

 

 

 

 

Battery

 

 

 

 

 

 

 

 

Re-install the battery cover by first inserting

 

 

 

 

 

Cover

 

 

 

 

 

 

 

 

its top into the wall station then inserting

 

 

 

(2) AAA

 

Lower

 

and securing its bottom.

 

 

 

 

 

 

 

 

Batteries

 

Clip

 

Apply entrapment warning label in a

 

 

 

 

 

 

 

convenient location next to the wall station.

 

 

 

 

 

 

 

Use mechanical fasteners if adhesive will

 

 

 

 

 

 

 

not adhere.

 

Entrapment

 

 

 

 

 

 

 

Label

 

 

 

 

 

NOTE: To slow blink rate or turn off the red

 

 

 

per

 

 

LED, refer to wall station operation page 34

 

 

 

 

 

 

 

 

O

at

 

 

 

 

 

T

D

 

 

 

 

 

 

o

e

 

 

 

 

 

 

 

 

 

“Backlit LED Light”.

 

 

 

 

o

 

 

 

 

Press

 

 

 

 

 

 

 

o

 

 

 

 

 

 

Here

r

 

 

 

 

 

 

 

Please Do Not Return This Product To The Store. Call Us Directly! Our Trained Technicians Will Answer Your Questions and/or Ship Any Parts You May Need. 22 You can reach us Toll Free at 1-888-827-3667 for Consumer Assistance or online at www.wayne-dalton.com

PRE-OPERATION

Page 29
Image 29
Wayne-Dalton 3663-372 installation instructions Pre-Operation, Mounting Wall Station, Installing Battery