Excalibur electronic P95-LP3 Venting, FPI Direct Vent System Flex Horizontal Terminations Only

Page 11

INSTALLATION

VENTING

FPI Direct Vent System Flex Horizontal Terminations Only

These venting systems, in combination with the P95-3 Direct Vent Gas Fireplace, have been tested and listed as a direct vent heater system by Warnock Hersey. The location of the termination cap must conform to the requirements in the Vent Terminal Locations diagram from the "Exterior Vent Termination Locations" section.

FPI Direct Vent Flex System Termination Kit (Part # 946-615) includes all the parts needed to install the P95-3 with a maximum run of 4 feet.

1)8" dia. fl exible liner (4 ft. length)

2)5" dia. fl exible liner (4 ft. length)

3)spring spacers (4)

4)thimble (2)

5)AstroCap XL termination cap (1)

6)screws (12)

7)tube of Mill Pac (1)

8)plated screws (8)

9)screws #8 x 1-1/2" Drill Point, Stainless Steel (4)

10)vinyl siding standoff

If longer runs are needed, the FPI Direct Vent system (Flex) kit is (Part # 946-616) which includes all the parts needed to install the P95-3 with a maximum 10' run.

1)8" dia. fl exible liner (10 ft. length)

2)5" dia. fl exible liner (10 ft. length)

3)spring spacers (7)

4)thimble (2)

5)AstroCap XL termination cap (1)

6)screws (12)

7)tube of Mill Pac (1)

8)plated screws (8)

9)screws #8 x 1-1/2" Drill Point, Stainless Steel (4)

10)vinyl siding standoff

Notes:

1)Liner sections should be continuous without any joints or seams.

2)Only Flex pipe purchased from FPI may be used for Flex installations.

3)Horizontal vent must be supported every 3 feet.

Excalibur® P95-3 Zero Clearance Direct Vent Gas Fireplace

11

Image 11
Contents 07/17/06 P95-3 Zero Clearance Direct Vent Gas FireplaceTo the New Owner CongratulationsTable of Contents Copy of Safety Decal for P95-3 Safety LabelFor the State of Massachusetts only RequirementsImportant Message Save These Instructions InstallationGeneral Safety Information Installation ChecklistOptional Heat Release KIT Locating Your GAS FireplaceManufactured Mobile Home Additional Requirements Optional Heatwave Duct System KITUnit Base STAND-OFFS Framing DimensionsCombustible Mantels Framing FinishingFloor Mounted Fireplaces Raised Fireplaces Facing RequirementHearth Requirements Facing Over 1 25mm ThickSide Nailing Strips Unit Assembly Prior to InstallationTop Standoff Assembly Venting IntroductionFPI Direct Vent System Flex Horizontal Terminations Only VentingExterior Vent Termination Locations Alternate Horizontal Termination Cap Flat Wall Installation Wall Thickness Vent Length RequiredCorner Installation Simpson DURA-VENT VentingParts not supplied by Dura-Vent Simpson DURA-VENT Venting Components ListDescription FPI Direct Vent System Flex Venting Arrangements Horizontal TerminationsOption + V1 H + H1 Horizontal Venting with Two 2 90o ElbowsHorizontal Venting with Three 3 90o Elbows Option + H1Option Vertical Venting with Two 2 90o ElbowsVertical Venting with Three 3 90o Elbows Simpson DURA-VENT Direct Vent GS System Venting Arrangements Vertical TerminationsInstallation Snorkel Terminations Below Grade InstallationContinue to assemble pipe lengths Vertical TerminationGS 8 Nominal Diameter ID Offset Installation ProceduresOffset Chart For FPI Direct Vent System FlexHigh Elevation Pilot AdjustmentGAS Line Installation GAS Pipe Pressure TestingInstallation of LPG Conversion Kit Installation of the DC Sparker Heat Shield Optional Brick Panels LOG SET InstallationPicture below is a view from the back of the burner Tab Screw Glass Door InstallationOptional Screen Doors Front FacadeSingle Door Accents Accent KIT InstallationWall Thermostat Thermostat Wire TableDo not cut the ground terminal off under any circumstances Wiring DiagramsFor Propane Units and Units Equipped with DC Spark Boxes Operating Instructions Copy of the Lighting Plate Instructions Normal Operating Sounds of GAS AppliancesMaintenance To Remove the Fans FAN MaintenanceTo Install the Fans Shut the power offBrick panel is very fragile handle with care Installing ValveRemoving Valve P95-3 Main Assembly Parts ListParts List P95-3 Burner Assembly & LOG SET Description P95-3 Flush Front AccessoriesWarranty Limited Lifetime WarrantyInstaller Please complete the following information