INSTALLATION

COMBUSTIBLE MANTELS

Because of the extreme heat this fireplace emits, the mantel clearances are critical. Combustible mantel clearances from top of unit are shown in Diagram below.

Note: A non-combustible mantel may be installed at a lower height if the framing is made of metal studs covered with a non-combustible board.

These drawings are to scale at 1:6 (one inch = 6 inches)

Mantel can be installed anywhere in shaded area or higher using the above scale.

Note: Ensure the paint that is used on the mantel and the facing is "heat resistant" or the paint may discolour.

FRAMING AND

FINISHING

1)Determine the total thickness of facing material (e.g. drywall plus ceramic tiles) to allow the fi nished surface to be fl ush with the front of the unit. Total facing thickness can vary from 1/2" (13mm) to 1" (32mm) thick.

Install Top Standoffs & Side Nailing Strips before unit is slipped into position. See the "Unit Assembly Prior to Installation" section for assembly details.

P95-3 Flat Wall Surround and Tile Kit

The P95-3 Flat Wall Surround, Hearth Pad and Tile Kit cannot be modifi ed in any way. It must be installed as manufactured.

P95-3 Flat Wall Surround and Tile Kit Specifi cations

UNIT BASE STAND-OFFS

2)Frame in the enclosure for the unit with framing material. The framed opening is 50-1/8" high x 53-3/8" wide x 21-1/4" deep (1276mm high x 1346mm wide x 533mm deep).

Framing Dimensions

A

B

C

53-3/8"

50-1/8"

21-1/4"

 

1346mm

1276mm

533mm

To accommodate varying thicknesses and

nishes of hearth materials, we have increased the overall height of the appliance by a further 1-1/8”. This increase is added with the inclusion of two stand-offs at the bottom of the unit, below the outer box, taking the overall height of the framing dimensions from 49” up to 50-1/8”.

In the event that you should choose to use thinner materials to fi nish the hearth, you can omit the stand-offs provided for raising the unit. However, we recommend that you leave the framing dimensions as they are in the manual andalteronlythefacingrequirementbyreducing it by the same distance that you have lowered the unit.

Insert the 2 unit base stand-offs underneath the unit as shown in the diagram below. Space the stand-offs centrally, approximately 2 or 2-1/2 feet apart. Ensure that the unit is not unstable.

3)For exterior walls, insulate the enclosure to the same degree as the rest of the house, apply vapour barrier and drywall, as per local installation codes. (Do not insulate the fireplace itself.)

8

Excalibur® P95-3 Zero Clearance Direct Vent Gas Fireplace

Image 8
Contents P95-3 Zero Clearance Direct Vent Gas Fireplace 07/17/06Congratulations To the New OwnerTable of Contents Safety Label Copy of Safety Decal for P95-3Requirements For the State of Massachusetts onlyInstallation General Safety InformationInstallation Checklist Important Message Save These InstructionsLocating Your GAS Fireplace Manufactured Mobile Home Additional RequirementsOptional Heatwave Duct System KIT Optional Heat Release KITFraming Dimensions Combustible MantelsFraming Finishing Unit Base STAND-OFFSFacing Requirement Hearth RequirementsFacing Over 1 25mm Thick Floor Mounted Fireplaces Raised FireplacesUnit Assembly Prior to Installation Top Standoff AssemblyVenting Introduction Side Nailing StripsVenting FPI Direct Vent System Flex Horizontal Terminations OnlyExterior Vent Termination Locations Flat Wall Installation Wall Thickness Vent Length Required Corner InstallationSimpson DURA-VENT Venting Alternate Horizontal Termination CapParts not supplied by Dura-Vent Simpson DURA-VENT Venting Components ListDescription Venting Arrangements Horizontal Terminations FPI Direct Vent System FlexHorizontal Venting with Two 2 90o Elbows Horizontal Venting with Three 3 90o ElbowsOption + H1 Option + V1 H + H1Option Vertical Venting with Two 2 90o ElbowsVertical Venting with Three 3 90o Elbows Venting Arrangements Vertical Terminations Simpson DURA-VENT Direct Vent GS SystemInstallation Below Grade Installation Snorkel TerminationsVertical Termination Continue to assemble pipe lengthsInstallation Procedures Offset ChartFor FPI Direct Vent System Flex GS 8 Nominal Diameter ID OffsetPilot Adjustment GAS Line InstallationGAS Pipe Pressure Testing High ElevationInstallation of LPG Conversion Kit Installation of the DC Sparker Heat Shield LOG SET Installation Optional Brick PanelsPicture below is a view from the back of the burner Glass Door Installation Optional Screen DoorsFront Facade Tab ScrewAccent KIT Installation Single Door AccentsThermostat Wire Table Wall ThermostatWiring Diagrams Do not cut the ground terminal off under any circumstancesFor Propane Units and Units Equipped with DC Spark Boxes Operating Instructions Normal Operating Sounds of GAS Appliances Copy of the Lighting Plate InstructionsMaintenance FAN Maintenance To Install the FansShut the power off To Remove the FansBrick panel is very fragile handle with care Installing ValveRemoving Valve Parts List P95-3 Main AssemblyParts List P95-3 Burner Assembly & LOG SET P95-3 Flush Front Accessories DescriptionWarranty Warranty Limited LifetimeInstaller Please complete the following information