Excalibur electronic P95-NG3, P95-LP3 installation manual Heat Shield

Page 26

INSTALLATION

19)Connect the DC spark generator wires to the SIT Valve with the screw, which is provided in the kit.

20)Locate the ground lug at the receptical box, left of the unit.

23)Run the other end of the ground wire and DC spark generator wires through the bushing on the heat shield.

Heat Shield

24)Plug the DC spark generator wires to the DC Sparker.

27)Mount the heat shield to the DC Sparker. Secure into place with the velcro, which is provided in the kit.

28)Find a location which is not too hot and is easy to reach for changing the battery.

29)Tie up the loose wire with the wire clip.

25) Connect the ground wire to the DC Sparker

21) Connect one end of the supplied green ground wire to the lug with the nut and washer from the kit.

Ground

wire from

kit

mounting bracket.

22)Install the 1/2" bushing to the heat shield.

26)Install the supplied battery into the DC Sparker Box by opening the battery compartment.

NOTE: The battery in the DC Sparker Box will need to be replaced annually.

Battery

Compartment

30)Check inlet and outlet pressures.

31)Check operation of fl ame control.

32)Check for proper fl ame appearance and glow on logs.

Installer Notice:

These instructions must be left with the appliance.

26

Excalibur® P95-3 Zero Clearance Direct Vent Gas Fireplace

Image 26
Contents P95-3 Zero Clearance Direct Vent Gas Fireplace 07/17/06Congratulations To the New OwnerTable of Contents Safety Label Copy of Safety Decal for P95-3Requirements For the State of Massachusetts onlyInstallation Checklist InstallationGeneral Safety Information Important Message Save These InstructionsOptional Heatwave Duct System KIT Locating Your GAS FireplaceManufactured Mobile Home Additional Requirements Optional Heat Release KITFraming Finishing Framing DimensionsCombustible Mantels Unit Base STAND-OFFSFacing Over 1 25mm Thick Facing RequirementHearth Requirements Floor Mounted Fireplaces Raised FireplacesVenting Introduction Unit Assembly Prior to InstallationTop Standoff Assembly Side Nailing StripsVenting FPI Direct Vent System Flex Horizontal Terminations OnlyExterior Vent Termination Locations Simpson DURA-VENT Venting Flat Wall Installation Wall Thickness Vent Length RequiredCorner Installation Alternate Horizontal Termination CapParts not supplied by Dura-Vent Simpson DURA-VENT Venting Components ListDescription Venting Arrangements Horizontal Terminations FPI Direct Vent System FlexOption + H1 Horizontal Venting with Two 2 90o ElbowsHorizontal Venting with Three 3 90o Elbows Option + V1 H + H1Option Vertical Venting with Two 2 90o ElbowsVertical Venting with Three 3 90o Elbows Venting Arrangements Vertical Terminations Simpson DURA-VENT Direct Vent GS SystemInstallation Below Grade Installation Snorkel TerminationsVertical Termination Continue to assemble pipe lengthsFor FPI Direct Vent System Flex Installation ProceduresOffset Chart GS 8 Nominal Diameter ID OffsetGAS Pipe Pressure Testing Pilot AdjustmentGAS Line Installation High ElevationInstallation of LPG Conversion Kit Installation of the DC Sparker Heat Shield LOG SET Installation Optional Brick PanelsPicture below is a view from the back of the burner Front Facade Glass Door InstallationOptional Screen Doors Tab ScrewAccent KIT Installation Single Door AccentsThermostat Wire Table Wall ThermostatWiring Diagrams Do not cut the ground terminal off under any circumstancesFor Propane Units and Units Equipped with DC Spark Boxes Operating Instructions Normal Operating Sounds of GAS Appliances Copy of the Lighting Plate InstructionsMaintenance Shut the power off FAN MaintenanceTo Install the Fans To Remove the FansBrick panel is very fragile handle with care Installing ValveRemoving Valve Parts List P95-3 Main AssemblyParts List P95-3 Burner Assembly & LOG SET P95-3 Flush Front Accessories DescriptionWarranty Warranty Limited LifetimeInstaller Please complete the following information