Excalibur electronic P95-LP3, P95-NG3 Venting Arrangements Horizontal Terminations

Page 15

INSTALLATION

VENTING ARRANGEMENTS - HORIZONTAL TERMINATIONS

SIMPSON DURA-VENT DIRECT VENT GS SYSTEM and

FPI DIRECT VENT SYSTEM (FLEX)

(Propane & Natural Gas)

The diagram shows all allowable combinations of vertical runs with horizontal terminations, using one 90o elbow (two 45o elbows equal one 90o elbow).

Simpson Dura-Vent 5" inner diameter 8" outer diameter

Note: Must use optional flue adapter (Part # 770-994) when using Simpson Dura-Vent pipe.

Regency® Flex Vent 5" inner diameter 8" outer diameter

Note: FPI Direct Vent System (Flex) is only approved for horizontal terminations.

A vent guard should be used whenever the termination is lower than the specifi ed minimum or as per local codes.

Please note that all vertical measurements are taken from the base of the unit excluding risers or bottom stand-offs.

Maintain clearances to combustibles as listed in the "Clearances," "Locating Your Gas Fireplace," "Combustible Mantels," "Unit Base Stand-offs," "Framing and Finishing," "Facing Requirement," & "Hearth Requirement" sections.

Horizontal vent must be supported every 3 feet.

Firestops are required at each floor level and whenever passing through a wall.

Excalibur® P95-3 Zero Clearance Direct Vent Gas Fireplace

15

Image 15
Contents 07/17/06 P95-3 Zero Clearance Direct Vent Gas FireplaceTo the New Owner CongratulationsTable of Contents Copy of Safety Decal for P95-3 Safety LabelFor the State of Massachusetts only RequirementsImportant Message Save These Instructions InstallationGeneral Safety Information Installation ChecklistOptional Heat Release KIT Locating Your GAS FireplaceManufactured Mobile Home Additional Requirements Optional Heatwave Duct System KITUnit Base STAND-OFFS Framing DimensionsCombustible Mantels Framing FinishingFloor Mounted Fireplaces Raised Fireplaces Facing RequirementHearth Requirements Facing Over 1 25mm ThickSide Nailing Strips Unit Assembly Prior to InstallationTop Standoff Assembly Venting IntroductionFPI Direct Vent System Flex Horizontal Terminations Only VentingExterior Vent Termination Locations Alternate Horizontal Termination Cap Flat Wall Installation Wall Thickness Vent Length RequiredCorner Installation Simpson DURA-VENT VentingSimpson DURA-VENT Venting Components List DescriptionParts not supplied by Dura-Vent FPI Direct Vent System Flex Venting Arrangements Horizontal TerminationsOption + V1 H + H1 Horizontal Venting with Two 2 90o ElbowsHorizontal Venting with Three 3 90o Elbows Option + H1Vertical Venting with Two 2 90o Elbows Vertical Venting with Three 3 90o ElbowsOption Simpson DURA-VENT Direct Vent GS System Venting Arrangements Vertical TerminationsInstallation Snorkel Terminations Below Grade InstallationContinue to assemble pipe lengths Vertical TerminationGS 8 Nominal Diameter ID Offset Installation ProceduresOffset Chart For FPI Direct Vent System FlexHigh Elevation Pilot AdjustmentGAS Line Installation GAS Pipe Pressure TestingInstallation of LPG Conversion Kit Installation of the DC Sparker Heat Shield Optional Brick Panels LOG SET InstallationPicture below is a view from the back of the burner Tab Screw Glass Door InstallationOptional Screen Doors Front FacadeSingle Door Accents Accent KIT InstallationWall Thermostat Thermostat Wire TableDo not cut the ground terminal off under any circumstances Wiring DiagramsFor Propane Units and Units Equipped with DC Spark Boxes Operating Instructions Copy of the Lighting Plate Instructions Normal Operating Sounds of GAS AppliancesMaintenance To Remove the Fans FAN MaintenanceTo Install the Fans Shut the power offInstalling Valve Removing ValveBrick panel is very fragile handle with care P95-3 Main Assembly Parts ListParts List P95-3 Burner Assembly & LOG SET Description P95-3 Flush Front AccessoriesWarranty Limited Lifetime WarrantyInstaller Please complete the following information