INSTALLATION

Option 1:

Option 2:

REMOTE CONTROL

WALL SWITCH

Option 3:

WALL THERMOSTAT

UsetheExcalibur® RemoteControlKit approved for this unit. Use of other systems may void your warranty.

The remote control kit comes with a hand held transmitter, a receiver and a wall mounting plate.

1)Choose a convenient location on the wall to install the receiver and the receptacle box (protection from extreme heat is very important). Run wires from the fi replace to that location. Use the Thermostat Wire Table.

2)Connect the two wires to the gas valve. See diagram below.

CAUTION

Do not connect millivolt remote control wires to a 120V wire.

1)Run the wire through the right or left side inlet opening. Be careful not to damage wire.

Note: We recommend a maximum of 15' of wire but if you wish to go with a longer run, use the Thermostat Wire Table.

2)Connect the wire to the wall switch and install into the receptacle box.

CAUTION

Do not connect millivolt

wall switch wire to a 120V wire.

A wall thermostat may be installed if desired, connect the wires as per the wiring diagram. Use the table below to determine the maximum wire length.

Note: Preferable if the thermostat is installed on an interior wall.

Excalibur offers an optional programmable thermostat but any 250-750 millivolt rated non- anticipator type thermostat that is CSA, ULC or UL approved may be used.

CAUTION

Do not connect millivolt

wall thermostat wires

to a 120V wire.

Thermostat Wire Table

Recommended Maximum Lead Length

(Two-Wire) When Using Wall

Thermostat (CP-2 System)

Wire Size

Max. Length

 

14 GA.

50

Ft.

 

16 GA.

32

Ft.

 

18 GA.

20

Ft.

 

20 GA.

12

Ft.

 

22 GA.

9

Ft.

 

3)Install 3AAAalkaline batteries in transmitter and 4 AA alkaline batteries in the receiver. Install the receiver and its cover in the wall. Switch the remote receiver to "remote" mode. The remote control is now ready for operation.

Excalibur® P95-3 Zero Clearance Direct Vent Gas Fireplace

31

Image 31
Contents 07/17/06 P95-3 Zero Clearance Direct Vent Gas FireplaceTo the New Owner CongratulationsTable of Contents Copy of Safety Decal for P95-3 Safety LabelFor the State of Massachusetts only RequirementsImportant Message Save These Instructions InstallationGeneral Safety Information Installation ChecklistOptional Heat Release KIT Locating Your GAS FireplaceManufactured Mobile Home Additional Requirements Optional Heatwave Duct System KITUnit Base STAND-OFFS Framing DimensionsCombustible Mantels Framing FinishingFloor Mounted Fireplaces Raised Fireplaces Facing RequirementHearth Requirements Facing Over 1 25mm ThickSide Nailing Strips Unit Assembly Prior to InstallationTop Standoff Assembly Venting IntroductionFPI Direct Vent System Flex Horizontal Terminations Only VentingExterior Vent Termination Locations Alternate Horizontal Termination Cap Flat Wall Installation Wall Thickness Vent Length RequiredCorner Installation Simpson DURA-VENT VentingDescription Simpson DURA-VENT Venting Components ListParts not supplied by Dura-Vent FPI Direct Vent System Flex Venting Arrangements Horizontal TerminationsOption + V1 H + H1 Horizontal Venting with Two 2 90o ElbowsHorizontal Venting with Three 3 90o Elbows Option + H1Vertical Venting with Three 3 90o Elbows Vertical Venting with Two 2 90o ElbowsOption Simpson DURA-VENT Direct Vent GS System Venting Arrangements Vertical TerminationsInstallation Snorkel Terminations Below Grade InstallationContinue to assemble pipe lengths Vertical TerminationGS 8 Nominal Diameter ID Offset Installation ProceduresOffset Chart For FPI Direct Vent System FlexHigh Elevation Pilot AdjustmentGAS Line Installation GAS Pipe Pressure TestingInstallation of LPG Conversion Kit Installation of the DC Sparker Heat Shield Optional Brick Panels LOG SET InstallationPicture below is a view from the back of the burner Tab Screw Glass Door InstallationOptional Screen Doors Front FacadeSingle Door Accents Accent KIT InstallationWall Thermostat Thermostat Wire TableDo not cut the ground terminal off under any circumstances Wiring DiagramsFor Propane Units and Units Equipped with DC Spark Boxes Operating Instructions Copy of the Lighting Plate Instructions Normal Operating Sounds of GAS AppliancesMaintenance To Remove the Fans FAN MaintenanceTo Install the Fans Shut the power offRemoving Valve Installing ValveBrick panel is very fragile handle with care P95-3 Main Assembly Parts ListParts List P95-3 Burner Assembly & LOG SET Description P95-3 Flush Front AccessoriesWarranty Limited Lifetime WarrantyInstaller Please complete the following information