Excalibur electronic P95-NG3, P95-LP3 Below Grade Installation, Snorkel Terminations

Page 20

INSTALLATION

UNIT INSTALLATION WITH HORIZONTAL TERMINATION

Install the vent system according to the manufacturer's instructions included with the components.

1)

Set the unit in its desired location. Check

 

to determine if wall studs or roof rafters

 

are in the way when the venting system is

 

attached. If this is the case, you may want

 

to adjust the location of the unit. Rough in

 

the gas preferably on the right side of the

 

unit and the electrical (junction block is on

 

the left side) on the left.

2)

Direct Vent pipe and fi ttings are designed

b)Horizontal runs of vent must be supported every three feet. Wall straps are available for this purpose.

5)Mark the wall for a 11" x 11" square hole. The center of the square hole should line up with the centerline of the horizontal pipe. Cut and frame the 10 inch square hole in the exterior wall where the vent will be terminated. If the wall being penetrated is constructedofnon-combustiblematerial,i.e. masonry block or concrete, a 8" dia. hole is acceptable.

Note: With Dura-Vent, the minimum height is achieved by installing a 90o elbow directly to the flue adaptor.

with special twist-lock connections to

connect the venting system to the appliance

fl ue outlet. A twist-lock appliance adaptor

is an available option that must be used in

conjunction with the Simpson Dura-Vent

Direct Vent GS system.

3) Put a bead of silicone inside the outer

section of the adapter and a bead of Mill

Pac on the inner collar. Slip the adapter

over the existing inner and outer fl ue collar

and fasten to the outer collar only with the

3 supplied screws (drilling pilot holes will

make this easier). Level the fi replace and

fasten it to the framing using nails or screws

through the nailing strips.

4) Assemble the desired combination of pipe

and elbows to the appliance adaptor and

twist-lock for a solid connection.

Note:

a)Twist-lockprocedure:Fourindentations, located on the female ends of pipes and fi ttings, are designed to slide straight onto the male ends of adjacent pipes and fi ttings, by orienting the four pipe indentations so they match and slide in to the four entry slots on the male ends, Diagram 1. Push the pipe sections completely together, then twist-lock one section clockwise approximately one-quarter turn, until the two sections are fully locked. The female locking lugs will not be visible from the outside, on the Black Pipe or fi ttings. They may be located by examining the inside of the female ends.

Diagram 1

Note: Apply sealant "Mill-Pac" to inner pipe and high temperature silicone sealant to outer pipe on every twist- lock joint.

Diagram 2

Note:

a)The horizontal run of vent must be level, or have a 1/4 inch rise for every 1 foot of run towards the termination. Never allow the vent to run downward. This could cause high temperatures and may present the possibility of a fi re.

b)The location of the horizontal vent termination on an exterior wall must meet all local and national building codes, and must not be blocked or obstructed. For External Vent Terminal Locations, see diagram from the "Exterion Vent Termination Locations" section.

c)Snorkel Terminations:

For installations requiring a vertical rise on the exterior of the building, 14-inch and36-inchtallSnorkelTerminations are available. Follow the same installation procedures as used for standard Horizontal Termination. NEVER install the snorkel upside down.

Diagram 3

*Diagam 3 & 4: As specified in CGA B149 InstallationCode.Localcodesorregulations may require different clearances.

Below Grade Installation

If the Snorkel Termination must be installed below grade, i.e. basement application, proper drainage must be provided to prevent water from entering the Snorkel Termination. Refer to Diagram 4. Do not attempt to enclose the Snorkel within the wall, or any other type of enclosure.

Diagram 4

NOTE: For Snorkel terminations in ABOVE grade installations, follow national or local code requirements.

6)The arrow on the vent cap should be pointing up. Insure that the 1-1/2" clearances to combustible materials are maintained (Diagram 4). Install the termination cap.

20

Excalibur® P95-3 Zero Clearance Direct Vent Gas Fireplace

Image 20
Contents P95-3 Zero Clearance Direct Vent Gas Fireplace 07/17/06Congratulations To the New OwnerTable of Contents Safety Label Copy of Safety Decal for P95-3Requirements For the State of Massachusetts onlyInstallation General Safety InformationInstallation Checklist Important Message Save These InstructionsLocating Your GAS Fireplace Manufactured Mobile Home Additional RequirementsOptional Heatwave Duct System KIT Optional Heat Release KITFraming Dimensions Combustible MantelsFraming Finishing Unit Base STAND-OFFSFacing Requirement Hearth RequirementsFacing Over 1 25mm Thick Floor Mounted Fireplaces Raised FireplacesUnit Assembly Prior to Installation Top Standoff AssemblyVenting Introduction Side Nailing StripsVenting FPI Direct Vent System Flex Horizontal Terminations OnlyExterior Vent Termination Locations Flat Wall Installation Wall Thickness Vent Length Required Corner InstallationSimpson DURA-VENT Venting Alternate Horizontal Termination CapParts not supplied by Dura-Vent Simpson DURA-VENT Venting Components ListDescription Venting Arrangements Horizontal Terminations FPI Direct Vent System FlexHorizontal Venting with Two 2 90o Elbows Horizontal Venting with Three 3 90o ElbowsOption + H1 Option + V1 H + H1Option Vertical Venting with Two 2 90o ElbowsVertical Venting with Three 3 90o Elbows Venting Arrangements Vertical Terminations Simpson DURA-VENT Direct Vent GS SystemInstallation Below Grade Installation Snorkel TerminationsVertical Termination Continue to assemble pipe lengthsInstallation Procedures Offset ChartFor FPI Direct Vent System Flex GS 8 Nominal Diameter ID OffsetPilot Adjustment GAS Line InstallationGAS Pipe Pressure Testing High ElevationInstallation of LPG Conversion Kit Installation of the DC Sparker Heat Shield LOG SET Installation Optional Brick PanelsPicture below is a view from the back of the burner Glass Door Installation Optional Screen DoorsFront Facade Tab ScrewAccent KIT Installation Single Door AccentsThermostat Wire Table Wall ThermostatWiring Diagrams Do not cut the ground terminal off under any circumstancesFor Propane Units and Units Equipped with DC Spark Boxes Operating Instructions Normal Operating Sounds of GAS Appliances Copy of the Lighting Plate InstructionsMaintenance FAN Maintenance To Install the FansShut the power off To Remove the FansBrick panel is very fragile handle with care Installing ValveRemoving Valve Parts List P95-3 Main AssemblyParts List P95-3 Burner Assembly & LOG SET P95-3 Flush Front Accessories DescriptionWarranty Warranty Limited LifetimeInstaller Please complete the following information