Excalibur electronic P95-LP3, P95-NG3 For Propane Units and Units Equipped with DC Spark Boxes

Page 33

INSTALLATION

For PROPANE Units and Units Equipped with DC Spark Boxes*

*For installation of the DC Spark Box refer to the LP Conversion instructions in this manual.

Excalibur® P95-3 Zero Clearance Direct Vent Gas Fireplace

33

Image 33
Contents 07/17/06 P95-3 Zero Clearance Direct Vent Gas FireplaceTo the New Owner CongratulationsTable of Contents Copy of Safety Decal for P95-3 Safety LabelFor the State of Massachusetts only RequirementsGeneral Safety Information InstallationInstallation Checklist Important Message Save These InstructionsManufactured Mobile Home Additional Requirements Locating Your GAS FireplaceOptional Heatwave Duct System KIT Optional Heat Release KITCombustible Mantels Framing DimensionsFraming Finishing Unit Base STAND-OFFSHearth Requirements Facing RequirementFacing Over 1 25mm Thick Floor Mounted Fireplaces Raised FireplacesTop Standoff Assembly Unit Assembly Prior to InstallationVenting Introduction Side Nailing StripsFPI Direct Vent System Flex Horizontal Terminations Only VentingExterior Vent Termination Locations Corner Installation Flat Wall Installation Wall Thickness Vent Length RequiredSimpson DURA-VENT Venting Alternate Horizontal Termination CapSimpson DURA-VENT Venting Components List DescriptionParts not supplied by Dura-Vent FPI Direct Vent System Flex Venting Arrangements Horizontal TerminationsHorizontal Venting with Three 3 90o Elbows Horizontal Venting with Two 2 90o ElbowsOption + H1 Option + V1 H + H1Vertical Venting with Two 2 90o Elbows Vertical Venting with Three 3 90o ElbowsOption Simpson DURA-VENT Direct Vent GS System Venting Arrangements Vertical TerminationsInstallation Snorkel Terminations Below Grade InstallationContinue to assemble pipe lengths Vertical TerminationOffset Chart Installation ProceduresFor FPI Direct Vent System Flex GS 8 Nominal Diameter ID OffsetGAS Line Installation Pilot AdjustmentGAS Pipe Pressure Testing High ElevationInstallation of LPG Conversion Kit Installation of the DC Sparker Heat Shield Optional Brick Panels LOG SET InstallationPicture below is a view from the back of the burner Optional Screen Doors Glass Door InstallationFront Facade Tab ScrewSingle Door Accents Accent KIT InstallationWall Thermostat Thermostat Wire TableDo not cut the ground terminal off under any circumstances Wiring DiagramsFor Propane Units and Units Equipped with DC Spark Boxes Operating Instructions Copy of the Lighting Plate Instructions Normal Operating Sounds of GAS AppliancesMaintenance To Install the Fans FAN MaintenanceShut the power off To Remove the FansInstalling Valve Removing ValveBrick panel is very fragile handle with care P95-3 Main Assembly Parts ListParts List P95-3 Burner Assembly & LOG SET Description P95-3 Flush Front AccessoriesWarranty Limited Lifetime WarrantyInstaller Please complete the following information