Excalibur electronic P95-LP3, P95-NG3 installation manual P95-3 Burner Assembly & LOG SET

Page 41

PARTS LIST

 

 

P95-3 BURNER ASSEMBLY & LOG SET

 

Part #

Description

52)

910-190

Piezo Ignitor & Nut

54)

948-043

Bottom Relief Spring

 

770-574/P

Valve Assy - Natural Gas

 

770-576/P

Valve Assy - Propane

56)

770-071

Gasket - Valve Tray

57)

910-478

Valve - S.I.T. - NG/LP

58)

*

Valve Bracket

66)

910-038

Pilot Assy 3 way fl ame - S.I.T. - NG

 

910-039

Pilot Assy 3 way fl ame - S.I.T. - LP

 

904-660

Orifi ce #30 - Natural Gas

 

904-431

Orifi ce #49 - Propane

 

936-170

Orifi ce Gasket

67)

780-057

Pilot Holder

68) W840470

Pilot Assembly Gasket

69)

770-070

Gasket - Relief Door Bottom

79)

770-525

Burner Assy - NG/LP

82)

770-003

Burner Grate Assy

83)

*

Rear Log Support Bracket

85)

770-930

Log Set

*Not available as a replacement part.

Excalibur® P95-3 Zero Clearance Direct Vent Gas Fireplace

41

Image 41
Contents 07/17/06 P95-3 Zero Clearance Direct Vent Gas FireplaceTo the New Owner CongratulationsTable of Contents Copy of Safety Decal for P95-3 Safety LabelFor the State of Massachusetts only RequirementsGeneral Safety Information InstallationInstallation Checklist Important Message Save These InstructionsManufactured Mobile Home Additional Requirements Locating Your GAS FireplaceOptional Heatwave Duct System KIT Optional Heat Release KITCombustible Mantels Framing DimensionsFraming Finishing Unit Base STAND-OFFSHearth Requirements Facing RequirementFacing Over 1 25mm Thick Floor Mounted Fireplaces Raised FireplacesTop Standoff Assembly Unit Assembly Prior to InstallationVenting Introduction Side Nailing StripsFPI Direct Vent System Flex Horizontal Terminations Only VentingExterior Vent Termination Locations Corner Installation Flat Wall Installation Wall Thickness Vent Length RequiredSimpson DURA-VENT Venting Alternate Horizontal Termination CapParts not supplied by Dura-Vent Simpson DURA-VENT Venting Components ListDescription FPI Direct Vent System Flex Venting Arrangements Horizontal TerminationsHorizontal Venting with Three 3 90o Elbows Horizontal Venting with Two 2 90o ElbowsOption + H1 Option + V1 H + H1Option Vertical Venting with Two 2 90o ElbowsVertical Venting with Three 3 90o Elbows Simpson DURA-VENT Direct Vent GS System Venting Arrangements Vertical TerminationsInstallation Snorkel Terminations Below Grade InstallationContinue to assemble pipe lengths Vertical TerminationOffset Chart Installation ProceduresFor FPI Direct Vent System Flex GS 8 Nominal Diameter ID OffsetGAS Line Installation Pilot AdjustmentGAS Pipe Pressure Testing High ElevationInstallation of LPG Conversion Kit Installation of the DC Sparker Heat Shield Optional Brick Panels LOG SET InstallationPicture below is a view from the back of the burner Optional Screen Doors Glass Door InstallationFront Facade Tab ScrewSingle Door Accents Accent KIT InstallationWall Thermostat Thermostat Wire TableDo not cut the ground terminal off under any circumstances Wiring DiagramsFor Propane Units and Units Equipped with DC Spark Boxes Operating Instructions Copy of the Lighting Plate Instructions Normal Operating Sounds of GAS AppliancesMaintenance To Install the Fans FAN MaintenanceShut the power off To Remove the FansBrick panel is very fragile handle with care Installing ValveRemoving Valve P95-3 Main Assembly Parts ListParts List P95-3 Burner Assembly & LOG SET Description P95-3 Flush Front AccessoriesWarranty Limited Lifetime WarrantyInstaller Please complete the following information