Excalibur electronic P95-LP3, P95-NG3 installation manual Installation

Page 19

INSTALLATION

The P95-3 is approved for a maximum 40 ft. straight vertical, with Simpson Dura-Vent Direct Vent GS vent systems for Propane and Natural Gas, as per the diagram.

The shaded area in the diagram shows all allowable combinations of straight vertical and offset to vertical terminations with Simpson Dura-Vent Direct Vent GS vent systems for Propane and Natural Gas. Maximum two 45o elbows allowed.

Vent must be supported at offsets

• Firestops are required at each floor level and whenever passing through a wall.

Maintain clearances to combustibles as listed in the "Clearances,"

"Locating Your Gas Fireplace," "Combustible Mantels," "Unit Base Stand-offs,""FramingandFinishing,""FacingRequirement,"&"Hearth Requirement" sections.

Please note that all vertical measurements are taken from the base of the unit excluding risers or bottom stand-offs.

Excalibur® P95-3 Zero Clearance Direct Vent Gas Fireplace

19

Image 19
Contents 07/17/06 P95-3 Zero Clearance Direct Vent Gas FireplaceTo the New Owner CongratulationsTable of Contents Copy of Safety Decal for P95-3 Safety LabelFor the State of Massachusetts only RequirementsImportant Message Save These Instructions InstallationGeneral Safety Information Installation ChecklistOptional Heat Release KIT Locating Your GAS FireplaceManufactured Mobile Home Additional Requirements Optional Heatwave Duct System KITUnit Base STAND-OFFS Framing DimensionsCombustible Mantels Framing FinishingFloor Mounted Fireplaces Raised Fireplaces Facing RequirementHearth Requirements Facing Over 1 25mm ThickSide Nailing Strips Unit Assembly Prior to InstallationTop Standoff Assembly Venting IntroductionFPI Direct Vent System Flex Horizontal Terminations Only VentingExterior Vent Termination Locations Alternate Horizontal Termination Cap Flat Wall Installation Wall Thickness Vent Length RequiredCorner Installation Simpson DURA-VENT VentingDescription Simpson DURA-VENT Venting Components ListParts not supplied by Dura-Vent FPI Direct Vent System Flex Venting Arrangements Horizontal TerminationsOption + V1 H + H1 Horizontal Venting with Two 2 90o ElbowsHorizontal Venting with Three 3 90o Elbows Option + H1Vertical Venting with Three 3 90o Elbows Vertical Venting with Two 2 90o ElbowsOption Simpson DURA-VENT Direct Vent GS System Venting Arrangements Vertical TerminationsInstallation Snorkel Terminations Below Grade InstallationContinue to assemble pipe lengths Vertical TerminationGS 8 Nominal Diameter ID Offset Installation ProceduresOffset Chart For FPI Direct Vent System FlexHigh Elevation Pilot AdjustmentGAS Line Installation GAS Pipe Pressure TestingInstallation of LPG Conversion Kit Installation of the DC Sparker Heat Shield Optional Brick Panels LOG SET InstallationPicture below is a view from the back of the burner Tab Screw Glass Door InstallationOptional Screen Doors Front FacadeSingle Door Accents Accent KIT InstallationWall Thermostat Thermostat Wire TableDo not cut the ground terminal off under any circumstances Wiring DiagramsFor Propane Units and Units Equipped with DC Spark Boxes Operating Instructions Copy of the Lighting Plate Instructions Normal Operating Sounds of GAS AppliancesMaintenance To Remove the Fans FAN MaintenanceTo Install the Fans Shut the power offRemoving Valve Installing ValveBrick panel is very fragile handle with care P95-3 Main Assembly Parts ListParts List P95-3 Burner Assembly & LOG SET Description P95-3 Flush Front AccessoriesWarranty Limited Lifetime WarrantyInstaller Please complete the following information