Excalibur electronic P95-NG3, P95-LP3 Accent KIT Installation, Single Door Accents

Page 30

INSTALLATION

ACCENT KIT INSTALLATION

SINGLE DOOR ACCENTS

1)Remove the rivets from the surround by pulling out the hoseclamp with a screwdriver or plyer. Re-install the rivets by putting them through the holes on the sides of the surround.

2)Take the hoseclamps and put them over the back of each rivet. Squeeze the hoseclamp to secure onto rivets ensuring that the hoseclamp is touching the backside of thesurround.Thehoseclamp can now be released.

3)Remove the handles by removing the nut and screw. Install the new handles by placing them in position over the holes on the surround louver. Put the screws through the holes and secure them by tightening them with a nut.

4)Place the emblem over the emblem design on the surround. Insert the studs through the holes. To secure them fi rst put on the split lock washer and then the nut and tighten.

5)Remove the 2 studs on the sides of the Hood. Insert the new studs through the holes and secure them by fi rst putting on the washer and then tighten with a nut.

DOUBLE DOOR ACCENTS

1)Remove the handles by removing the nut and screw. Install the new handles by placing them in position over the holes on the door(s). Put the studs through the holes and secure them by tightening them with a nut.

30

Excalibur® P95-3 Zero Clearance Direct Vent Gas Fireplace

Image 30
Contents P95-3 Zero Clearance Direct Vent Gas Fireplace 07/17/06Congratulations To the New OwnerTable of Contents Safety Label Copy of Safety Decal for P95-3Requirements For the State of Massachusetts onlyInstallation Checklist InstallationGeneral Safety Information Important Message Save These InstructionsOptional Heatwave Duct System KIT Locating Your GAS FireplaceManufactured Mobile Home Additional Requirements Optional Heat Release KITFraming Finishing Framing DimensionsCombustible Mantels Unit Base STAND-OFFSFacing Over 1 25mm Thick Facing RequirementHearth Requirements Floor Mounted Fireplaces Raised FireplacesVenting Introduction Unit Assembly Prior to InstallationTop Standoff Assembly Side Nailing StripsVenting FPI Direct Vent System Flex Horizontal Terminations OnlyExterior Vent Termination Locations Simpson DURA-VENT Venting Flat Wall Installation Wall Thickness Vent Length RequiredCorner Installation Alternate Horizontal Termination CapSimpson DURA-VENT Venting Components List DescriptionParts not supplied by Dura-Vent Venting Arrangements Horizontal Terminations FPI Direct Vent System FlexOption + H1 Horizontal Venting with Two 2 90o ElbowsHorizontal Venting with Three 3 90o Elbows Option + V1 H + H1Vertical Venting with Two 2 90o Elbows Vertical Venting with Three 3 90o ElbowsOption Venting Arrangements Vertical Terminations Simpson DURA-VENT Direct Vent GS SystemInstallation Below Grade Installation Snorkel TerminationsVertical Termination Continue to assemble pipe lengthsFor FPI Direct Vent System Flex Installation ProceduresOffset Chart GS 8 Nominal Diameter ID OffsetGAS Pipe Pressure Testing Pilot AdjustmentGAS Line Installation High ElevationInstallation of LPG Conversion Kit Installation of the DC Sparker Heat Shield LOG SET Installation Optional Brick PanelsPicture below is a view from the back of the burner Front Facade Glass Door InstallationOptional Screen Doors Tab ScrewAccent KIT Installation Single Door AccentsThermostat Wire Table Wall ThermostatWiring Diagrams Do not cut the ground terminal off under any circumstancesFor Propane Units and Units Equipped with DC Spark Boxes Operating Instructions Normal Operating Sounds of GAS Appliances Copy of the Lighting Plate InstructionsMaintenance Shut the power off FAN MaintenanceTo Install the Fans To Remove the FansInstalling Valve Removing ValveBrick panel is very fragile handle with care Parts List P95-3 Main AssemblyParts List P95-3 Burner Assembly & LOG SET P95-3 Flush Front Accessories DescriptionWarranty Warranty Limited LifetimeInstaller Please complete the following information