INSTALLATION
OPTIONAL COVER PLATE TEMPLATE
1)Ensure top clip screws are at top of oblong holes before installation.
Oblong Screw
Holes
2)Position bottom of cover plate over pins located at the bottom of the fi rebox.
Pins
3)Bring cover plate towards the unit and hook top clip over and behind the glass frame.
Thetopclipmayneedtobeadjusted.Loosen the 2 screws that secure the top clip to let the cover plate settle over and behind the glass frame. Once settled tighten screws.
Top Clip
Back View of
Cover Plate
Pin Holes
TO REMOVE:
1)Remove 2 screws that secure top clip. Ensure to hold cover plate as it will fall forward.
2)Pull out top clip that is still hooked onto glass.
UNIT ASSEMBLY
PRIOR TO
INSTALLATION
The 2Top Standoffs must be correctly positioned and attached to the top before unit is slipped into position.
Top Standoff Assembly
The top standoffs are shipped in a fl at position and must be folded into shape and attached.
1)Remove the standoffs from the fi replace top.
2)Take each standoff and bend into the correct shape. Bend up at the bend lines until the screw holes in the standoff and the pre- punched screw holes on the fi replace top line up.
3)Attach the standoff securely to the top with 2
screws per standoff (on opposite corners).
Side Nailing Strips
The side nailing strips come attached to the unit. There are 2 plates, one on the top and bottom that can be folded out as required.
Plates can be
folded out.
VENTING
INTRODUCTION
The
Note: These flue pipes must not be
connected to any other appliance.
The gas appliance and vent system must be vented directly to the outside of the building, and never be attached to a chimney serving a separate solid fuel or gas burning appliance. Each direct vent gas appliance must use it's own separate vent system. Common vent systems
10 | Excalibur® |