7 Connect water boiler piping

General water piping information:

 

 

 

 

 

 

Table 6 Recommended minimum pipe sizes for

 

• System water supply and return piping should be installed and piping

 

 

 

known flow rates.

connections attached to boiler before erecting jacket or installing controls.

 

 

 

 

 

 

• Do not pipe in through supply and out through return. This creates reverse

 

 

 

 

 

 

 

 

 

 

 

 

water flow through boiler that must not be used.

 

 

 

 

 

 

 

 

 

 

 

 

• When three-way valves are used for temperature modulation, install slow-

 

 

 

 

 

 

opening (minimum 10-minute) valves and boiler mixing pump to minimize

 

 

 

 

 

 

 

 

 

 

 

 

potential of boiler thermal shock. See W-M Bulletin AE-8402.

 

 

 

 

 

 

Install piping:

Install piping as shown in Figure 12 for single boilers. For multiple boilers, see Figure 13, page 15.

Improperly piped systems or undersized piping can contribute to erratic boiler operation and possible boiler or system damage.

1.Connect supply and return piping: a. Size according to tables below.

1)For unknown flow rates, size piping per Table below, using 20°F. temperature rise through boiler.

2)For known flow rates or higher flow rate through boiler, size piping per Table below.

Flow at higher rates than shown in Table below for pipe size can damage boiler, causing substantial property damage.

b.Locate circulator in supply piping.

c.For return piping, use full diameter pipe for 10 times that diameter before making any reduction. For example, a 4-inch return should not be reduced any closer to boiler return tapping than 40 inches.

d.Install system blow-off (drain) valve in lowest part of return piping close to boiler. ASME minimum size requirements are shown in Table 5.

2.Install expansion tank:

a.Closed type – connect to 1" tapping “K” (refer to pages 28 and 29). Use 1” N.P.T. piping. Any horizontal piping must pitch up toward tank at least 1 inch per each 5 feet of piping.

b.Diaphragm type – Refer to tank manufacturer’s literature for location. Install automatic air vent in “K” tapping.

c.Connect cold water fill to expansion tank piping. See Figure 12, page 14. Also shown are recommended valves and water meter, when used. Water meter will detect added make-up water, indicating leaks in system.

Table 7 ASME drain valve size

Figure 12 Water boiler piping, typical

Table 5 Recommended minimum pipe sizes when flow rate is not known (see Figure 12)

14

Part No. 550-141-935/0602

Image 14
Contents Boiler Manual Contents Before selecting boiler location Before installing boilerInstallation must comply with Lay a foundation, if neededProvide combustion and ventilation air openings Set boiler in place For block assemblyUsing crane attach free end of cables to eye of crane For packaged boilerPrepare back section Install back refractory blanketAssemble block Place a block under pipe to hold section uprightPrepare remaining sections Install intermediate sectionsIf using tankless heater TI sections Perform hydrostatic pressure test Prepare boiler and testInstall cleanout plates Complete block assemblyInstall burner mounting plate on front section Install collector hold-down bolts Install flue collectorFlue collector assembly Prepare flue collector hood assemblyInstall flue collector Rear flue boilers only Before installing flue collectorAfter installing flue collector, ALL Boilers Top flue boilers onlyInstall flue collector General water piping information Install pipingConnect water boiler piping Piping for multiple boilers see Figure Size secondary boiler pump GPM based on following formulasConnect steam boiler piping General steam piping informationConnect steam boiler piping Condensate piping to boiler Condensate receiver capacity Multiple Steam Boiler Piping Gravity Condensate Return Install support brackets and rails Install jacketBefore installing jacket Install jacket front and rear panelsInstall jacket Install jacket trim Install jacket side panelsInstall jacket top panels Jacket side panel placement Models 380, 480, 580 Jacket side panel placement Models 780, 880 Jacket side panel placement Models 1080, 1180, Jacket top panel placement Size piping no smaller than heater inlet and outlet Pipe tankless heatersTo pipe tankless heaters Install water boiler controls Install controlsInstall steam boiler controls Install controls where shown in and FigureWater level control locations see Table Select type of venting system Connect breeching and venting systemsGeneral venting information Construct metal breeching Make final adjustments Install burnerWiring and fuel piping Freeze protection when used Check boiler for gas-tight sealDimensions and ratings Dimensions and ratings Parts Parts Handling ceramic fiber and fiberglass materials Eye Irrigate immediately Breathing Fresh airPropane boilers propane gas odorant All Residential & Commercial Cast Iron Boilers
Related manuals
Manual 44 pages 43.26 Kb