P5 | Preparing the Opening | |
| ||
Tools Needed: | If you just removed your existing door or you are installing a | |
Recommended | new door, complete all steps in PREPARING THE OPENING. | |
To ensure secure mounting of track brackets, side and center | ||
tools from | ||
brackets, or steel angles to new or | ||
page 5 | ||
| recommended to follow the procedures outlined in DASMA | |
| Technical Data Sheets #156, #161 and #164 at www.dasma. | |
| com. | |
| The inside perimeter of your garage door opening should be | |
| framed with wood jamb and header material. The jambs and | |
| header must be securely fastened to sound framing members. | |
| It is recommended that 2” x 6” lumber be used. The jambs | |
| must be plumb and the header level. The jambs should extend | |
| a minimum of 12” (305 mm) above the top of the opening | |
| for TorqueMaster counterbalance systems. For low headroom | |
| applications, the jambs should extend to the ceiling height. | |
| Minimum side clearance required, from the opening to the | |
| wall, is | |
| IMPORTANT: Closely inspect jambs, header and mounting | |
| surface. Any wood found not to be sound, must be replaced. | |
| For TorqueMaster counterbalance systems, a suitable | |
| mounting surface (2” x 4”) must be firmly attached to the | |
| wall, above the header at the center of the opening. | |
| NOTE: Drill a 3/16” pilot hole in the mounting surface to avoid | |
| splitting the lumber. Do not attach the mounting surface with | |
| nails. | |
| Weather Seal (May Not Be Included): | |
| Cut or trim the weather seal (if necessary) to the header and | |
| jambs. | |
| For quick install track: Align the header seal with the inside | |
| edge of the header and temporarily secure it to the header |
suitable mounting
surface 2” x 6”
header boardlumber minimum 2” x 6” lumber
preferred
| door |
level header | height |
|
plumb jambs
door
width
Headroom
Header | Backroom |
jamb
WEATHER SEAL
jamb
Weather
with equally spaced nails. Next, fit the jamb seals up tight |
against the header seal and flush with the inside edge of the |
jamb. Temporarily secure the jamb seals with equally space |
nails approximately 12” to 18” apart. This will keep the bottom |
Jamb
seal
section from falling out of the opening during installation. |
For fully adjustable track: Align the header seal 1/8” to 1/4” |
inside the header and temporarily secure it to the header with |
equally spaced nails. Next, fit the jamb seals up tight against |
the header seal and 1/8” to 1/4” inside the jamb. Temporarily |
secure the jamb seals with equally space nails approximately |
12” to 18” apart. This will keep the bottom section from falling |
out of the opening during installation. |
NOTE: Do not permanently attach weather seal to the jamb |
at this time. |
HEADROOM REQUIREMENT: Headroom is defined as the |
space needed above the top of the door for tracks, springs, |
etc. to allow the door to open properly. If the door is to be |
motor operated, |
required. |
NOTE: 6” LHR Conversion Kit is available for 12” Radius only. |
Contact your local |
BACKROOM REQUIREMENT: Backroom is defined as the |
distance needed from the opening back into the garage to |
allow the door to open fully. |
Quick Install Track
Headroom requirement
TRACK TYPE | TorqueMaster® |
|
|
12” Radius track | 11” (279 mm) |
|
|
6” LHR Kit† | 6” (152 mm) |
|
|
Backroom requirement
DOOR HEIGHT | TRACK | MANUAL | MOTOR | |
LIFT | OPERATED | |||
|
| |||
7’0” | 12” Radius | 98” | 125” | |
(2489 mm) | (3175 mm) | |||
|
| |||
|
|
|
| |
8’0” | 12” Radius | 110” | 137” | |
(2794 mm) | (3480 mm) | |||
|
| |||
|
|
|
|