American Water Heater VG6250T100 instruction manual Concentric Termination Flat Roof Clearance, A

Page 28
CONCENTRIC TERMINATION

5.Secure assembly to roof structure as shown in Figure 23 using field supplied metal strapping or equivalent support material.

NOTE: Ensure termination height is above the roof surface or anticipated snow level as shown in Figure 23.

6.Install rain cap and small diameter pipe assembly in roof penetration assembly, Ensure small diameter pipe is cemented and bottomed in Y concentric fitting.

7.Cement water heater combustion air intake and vent pipes to concentric vent termination assembly. See Figure 23 for proper pipe attachment.

8.Operate heater through 1 heat cycle to ensure combustion air and vent pipes are properly connected to concentric vent termination connections.

Flat Roof Installation

When installing a concentric termination vertically through a flat roof, the termination’s vent cap must be a minimum of 10 feet (3

m)away from any parapet, vertical wall or structure as shown in Figure 23A.

If this required 10 foot (3 m) distance to a parapet, vertical wall or structure cannot be maintained, standard terminations must be used. See Vertical Termination Installation.

CONCENTRIC TERMINATION(S) MUST BE A MINIMUM OF 10 FEET (3 m) AWAY FROM ANY PARAPET, VERTICAL WALL OR STRUCTURE.

CONCENTRIC TERMINATION

FLAT ROOF CLEARANCE

Figure 23A.

PROCEDURE 2 SIDE WALL TERMINATION, see Figure 24.

Figure 24.

1. Determine best location for termination kit.

NOTE: Consideration for the following should be used when determining an appropriate location for the termination kit:

Termination kit positioned where the vent vapors will not damage plants/shrubs or air conditioning equipment.

Termination kit positioned so it will not be affected by wind eddy that may allow recirculation of combustion products, or airborne leaves, or light snow.

Termination kit positioned where it will not get damaged or be subjected to foreign objects, such as stones, balls, etc.

Termination kit positioned where the vent vapors will not be objectionable.

NOTE: See the venting information (starting on page 20) in this manual for additional vent location requirements.

2.Cut 1 hole (5 in. diameter)

3.Partially assemble concentric vent termination kit .

a)Cement the Y concentric fitting to larger diameter kit pipe, see Figure 19.

b)Cement the rain cap to the smaller diameter kit pipe, see Figure 22.

NOTE: Instead of cementing the smaller pipe to the rain cap, a field-supplied stainless steel screw may be used to secure the 2 components together when field disassembly is desired for cleaning, see Figure 22.

When using alternate screw assembly method, drill clearance hole in rain cap and pilot hole in vent pipe for screw being used. Failure to drill adequate holes may cause cracking of PVC components, allowing combustion products to be recirculated. Failure to follow this warning could result in personal injury or death.

Do not operate the heater with rain cap removed or recirculation of combustion products may occur. Water may also collect inside larger combustion-air pipe and flow to the burner enclosure. Failure to follow this warning could result in product damage or improper operation, personal injury or death.

4.Install Y concentric fitting and pipe assembly through structure’s hole.

NOTE: Do not allow insulation or other materials to accumulate inside pipe assembly when installing through hole.

28

Image 28
Contents For Your Safety whenever maintenance adjustment or service is requiredRESIDENTIAL GAS WATER HEATERS Instruction Manualtable of contents APPROVALS safe installation, use and serviceDANGER general safety information PrecautionsImproper installation, use and service may result in property damage Explosion Hazardgeneral safety information General Safety Information Fire or Explosion HazardBreathing Hazard - Carbon Monoxide Gas Electrical Shock HazardPreparing For The Installation introductionAbbreviations Used Qualificationsfeatures and components REPLACEMENT PARTS AND DELIMING PRODUCTSGet To Know Your Water Heater - Gas Models Control Assemblyinstallation consideration Rough In DimensionsTable 1 - Rough-In-Dimensions Table 2 - Capacity, Gas and Electrical CharacteristicsProperty Damage Hazard Locating The Water HeaterInsulation Blankets Combustion Air and VentilationUnconfined Space Confined Space Fresh Air Openings For Confined SpacesOutdoor Air Through Two Openings Outdoor Air Through One OpeningOutdoor Air Through Two Horizontal Ducts Air From Other Indoor Spacesinstalling the new water heater Power SupplyChemical Vapor Corrosion Water PipingMixing Valves Dishwashing MachinesSpace Heating and Potable Water System Time to Produce 2nd & 3rdThermal Expansion Closed Water SystemsT & P Valve and Pipe Insulation if supplied Water Damage Hazard Explosion HazardTemperature-Pressure Relief Valve T&P Valve Discharge Pipe RequirementsGas Piping Supply Gas RegulatorCondensate Piping SEDIMENT TRAPSHigh Altitude Installations Filling the Water HeaterVenting If using 2” inch vent pipeIf using 3” inch vent pipe VENT PIPE TERMINATIONINSTALLATION OF VENT SYSTEM VENT TERMINAL INSTALLATION, SIDEWALLInstallation Requirements - Commonwealth of Massachusetts Installation of Carbon Monoxide DetectorsCommonwealth of Massachusetts Approved Carbon Monoxide DetectorsTermination Clearances Sidewall Power Vent POWER VENTTermination Clearances Sidewall Direct Vent Installation Sequence SEQUENCE OF INSTALLATIONS, FIGURE 15AVent Termination - Figure 15A DIRECT VENT terminal installation Figure 15BVERTICAL VENT TERMINAL INSTALLATION Flat Roof InstallationConcentric vent installation SAFETY CONSIDERATIONSINSTALLATION PROCEDURE 1 ROOF TERMINATION, see Figure Table 6 - KIT COMPONENTSPROCEDURE 2 SIDE WALL TERMINATION, see Figure CONCENTRIC TERMINATION FLAT ROOF CLEARANCEFigure 23A MULTI-CONCENTRIC VENT TERMINATIONS direct vent diagram Vent Pipe Preparation RECOMMENDED BRUSH* SIZE FOR PRIMER AND CEMENT APPLICATIONS1. INITIAL PREPARATION 2. SELECTION OF MATERIALSD. Inspection, cleaning, priming STEP E F. Joint assemblySTEP F G. Cleanup and joint movement B. DeburringControls and Switches BLOWER PROVER SWITCHBLOCKED EXHAUST SWITCH BLOCKED INTAKE SWITCHPower Vent Wiring Schematic - Figure WIRE TO GROUND CHECK INDICATES ZERO VOLTAGETHIS WATER HEATER IS POLARITY SENSITVE BEFORE APPLYING ELECTRICITY TO THIS HEATER BE CERTAIN THAT SUPPLY NEUTRALFOR YOUR SAFETY READ BEFORE LIGHTING OPERATING INSTRUCTIONSTO TURN OFF GAS TO APPLIANCE WARNING TURN OFF ALL ELECTRIC POWER BEFORE SERVICINGtemperature regulation HI LIMIT SWITCH ECOTime to Produce 2nd & 3rd Degreeadjust user settings control system operationOperating Set Point 120FDescription IconStatus Icons State MenuOperating States Control System MenusUser Settings & Control System Menus MENUHELP Main Menu140F Heater StatusDisplay Settings Heater InformationTemperature Units Backlight DelayFault History Fault OccurrenceRestore Factory Defaults Blocked ExhaustService Contact Information Show Contact InformationChange Contact Name Current Contact Infofor your information Start Up ConditionsOperational Conditions SMOKE/ODORperiodic maintenance Venting System InspectionAnode Rod Inspection Temperature-Pressure Relief Valve OperationService Draining and FlushingBurn harzard Hot water discharge Keep hands clear of drain valve dischargemaintenance Temperature-Pressure Relief Valve Testleakage checkpoints troubleshooting Installation ChecklistWater Heater Location VentingSequence Of Operation Flow Chart YESNOOperational Problems Fault and Alert ConditionsBurn Hazard Replacement PartsResetting Control System Lock Outs Electrical Shock HazardDiagnostic Checks AC Reversed Ignition FailureLow Igniter Current Blocked ExhaustBlower Prover Failure Blower Prover OpenBlocked Air Intake Energy Cut Out ECOPage Page Page LIMITED RESIDENTIAL GAS WARRANTY SERVICE AND LABOR RESPONSIBILITYCLAIM PROCEDURE CONDITIONS AND EXCEPTIONSPO Box 1597, 500 Princeton Road Johnson City, TN American Water Heater Product Service and SupportCopyright 2011 American Water Heaters. All rights reserved