American Water Heater VG6250T100 troubleshooting, Installation Checklist, Water Heater Location

Page 50
troubleshooting

troubleshooting

Installation Checklist

The list below represents some of the most critical installation requirements that, when overlooked, often result in operational problems, down time and needless parts replacement. This is not a complete list. Before performing any troubleshooting procedures use the list below to check for installation errors. Costs to correct installation errors are not covered under the limited warranty. Ensure all installation requirements and instructions in this manual have been maintained and followed.

Water Heater Location

1.Ensure proper clearances to combustibles are maintained and there is sufficient room to service the water heater.

2.Ensure the area is free of corrosive elements and flammable materials.

Venting

3.Ensure the intake air and/or vent (exhaust) piping is the correct size for the installed length.

4.Ensure the maximum equivalent feet of pipe has not been exceeded for the intake air and/or vent pipe.

5.Ensure the maximum number of elbows has not been exceeded in the intake air and/or vent pipe.

6.Ensure all exterior clearances for the intake air, vent and concentric terminations are maintained. These clearances and those cited by local and national codes must be maintained.

7.If venting “direct vent”, ensure the screen located in air intake at the water heater was removed.

Gas Supply And Piping

8.Ensure the supply gas line to each water heater meets the minimum supply gas line size requirements.

Condensate Drain

9.Ensure the condensate drain is properly connected to the exhaust elbow on the water heater with a water trap to prevent vent gases from escaping into the installed space and draining freely to a suitable floor drain.

Electrical Connections

10.Ensure the power supply connections to the water heater are polarity correct.

11.Ensure the water heater is properly grounded. Flame sensing requires an adequate earth ground. If the water heater is not properly grounded it will cause Ignition Failure.Sequence Of

Operation.

Installation Checklist

Read the Sequence of Operation below before attempting to correct any operational problems. See the Sequence Of Operation

Flow Chart.

1.When the control system is first powered, during boot up, it will display water heater model information during initialization. After a few moments the control system LCD which is part of the UIM (user interface module) will display the default screen known as the "Desktop" screen.

2.If the control system determines that the actual water temperature inside the tank is below the programmed Operating Set Point minus the Differential setting, a heating cycle is activated.

3.The control system then performs selected diagnostic system checks. This includes confirming the blocked exhaust, blocked intake and ECO (energy cut out) switch contacts are closed. The Blower Prover Switch contacts are confirmed open.

4.If all diagnostic checks are successfully passed, the control system energizes the Combustion Blower for pre-purge.

5.The control system must confirm the Blower Prover Switch contacts close after the Combustion Blower is energized.

6.If the Blower Prover Switch contacts are confirmed closed the control system energizes the Hot Surface Igniter for the igniter warm-up period.

7.The control system monitors the igniter current and must sense a minimum of 0.6 AC amps during the igniter warm up period (10 seconds).

8.If igniter amperage is confirmed at or above the required minimum the control system energizes the 24 V Gas Valve allowing gas to flow to the Main Burner.

9.The control system de-energizes the Hot Surface Igniter.

10.The control system monitors the flame sensor to confirm a flame is present at the Main Burner. If a flame is not verified during the ignition trial period the control system will try for ignition up to two more times. If flame can not be verified after three trials for ignition, the control system will lock out and display the “Ignition Failure” Fault message.

11.If a flame is verified, the control system will enter the heating mode where it will continue heating the water until the Operating Set Point is reached. At this point, the control system will de- energize the 24 V Gas Valve and enter the post-purge cycle (60 seconds).

12.The Combustion Blower will run for the duration of the post- purge cycle to purge the water heater of all combustion gases. When the post-purge cycle is complete, the blower is de- energized and will coast to a stop.

13.The control system now enters the standby mode while continuing to monitor the internal storage tank water temperature and the state of other system devices. If the tank temperature drops below the Operating Set Point minus the Differential setting, the control will automatically return to Step 2 and repeat the operating cycle.

50

Image 50
Contents RESIDENTIAL GAS WATER HEATERS For Your Safetywhenever maintenance adjustment or service is required Instruction Manualtable of contents DANGER safe installation, use and serviceAPPROVALS Improper installation, use and service may result in property damage general safety informationPrecautions Explosion Hazardgeneral safety information Breathing Hazard - Carbon Monoxide Gas General Safety InformationFire or Explosion Hazard Electrical Shock HazardAbbreviations Used Preparing For The Installationintroduction QualificationsGet To Know Your Water Heater - Gas Models features and componentsREPLACEMENT PARTS AND DELIMING PRODUCTS Control AssemblyTable 1 - Rough-In-Dimensions installation considerationRough In Dimensions Table 2 - Capacity, Gas and Electrical CharacteristicsProperty Damage Hazard Locating The Water HeaterUnconfined Space Combustion Air and VentilationInsulation Blankets Outdoor Air Through Two Openings Confined SpaceFresh Air Openings For Confined Spaces Outdoor Air Through One OpeningOutdoor Air Through Two Horizontal Ducts Air From Other Indoor SpacesChemical Vapor Corrosion installing the new water heaterPower Supply Water PipingSpace Heating and Potable Water System Mixing ValvesDishwashing Machines Time to Produce 2nd & 3rdT & P Valve and Pipe Insulation if supplied Closed Water SystemsThermal Expansion Temperature-Pressure Relief Valve Water Damage HazardExplosion Hazard T&P Valve Discharge Pipe RequirementsCondensate Piping Gas PipingSupply Gas Regulator SEDIMENT TRAPSHigh Altitude Installations Filling the Water HeaterIf using 3” inch vent pipe VentingIf using 2” inch vent pipe VENT PIPE TERMINATIONINSTALLATION OF VENT SYSTEM VENT TERMINAL INSTALLATION, SIDEWALLCommonwealth of Massachusetts Installation Requirements - Commonwealth of MassachusettsInstallation of Carbon Monoxide Detectors Approved Carbon Monoxide DetectorsTermination Clearances Sidewall Power Vent POWER VENTTermination Clearances Sidewall Direct Vent Vent Termination - Figure 15A DIRECT VENT terminal installation Installation SequenceSEQUENCE OF INSTALLATIONS, FIGURE 15A Figure 15BVERTICAL VENT TERMINAL INSTALLATION Flat Roof InstallationINSTALLATION PROCEDURE 1 ROOF TERMINATION, see Figure Concentric vent installationSAFETY CONSIDERATIONS Table 6 - KIT COMPONENTSFigure 23A CONCENTRIC TERMINATION FLAT ROOF CLEARANCEPROCEDURE 2 SIDE WALL TERMINATION, see Figure MULTI-CONCENTRIC VENT TERMINATIONS direct vent diagram 1. INITIAL PREPARATION Vent Pipe PreparationRECOMMENDED BRUSH* SIZE FOR PRIMER AND CEMENT APPLICATIONS 2. SELECTION OF MATERIALSSTEP F G. Cleanup and joint movement D. Inspection, cleaning, primingSTEP E F. Joint assembly B. DeburringBLOCKED EXHAUST SWITCH Controls and SwitchesBLOWER PROVER SWITCH BLOCKED INTAKE SWITCHTHIS WATER HEATER IS POLARITY SENSITVE BEFORE APPLYING Power Vent Wiring Schematic - FigureWIRE TO GROUND CHECK INDICATES ZERO VOLTAGE ELECTRICITY TO THIS HEATER BE CERTAIN THAT SUPPLY NEUTRALTO TURN OFF GAS TO APPLIANCE FOR YOUR SAFETY READ BEFORE LIGHTINGOPERATING INSTRUCTIONS WARNING TURN OFF ALL ELECTRIC POWER BEFORE SERVICINGTime to Produce temperature regulationHI LIMIT SWITCH ECO 2nd & 3rd DegreeOperating Set Point adjust user settingscontrol system operation 120FStatus Icons IconDescription Operating States StateMenu Control System MenusHELP User Settings & Control System MenusMENU Main Menu140F Heater StatusTemperature Units Display SettingsHeater Information Backlight DelayRestore Factory Defaults Fault HistoryFault Occurrence Blocked ExhaustChange Contact Name Service Contact InformationShow Contact Information Current Contact InfoOperational Conditions for your informationStart Up Conditions SMOKE/ODORAnode Rod Inspection periodic maintenanceVenting System Inspection Temperature-Pressure Relief Valve OperationBurn harzard Hot water discharge ServiceDraining and Flushing Keep hands clear of drain valve dischargemaintenance Temperature-Pressure Relief Valve Testleakage checkpoints Water Heater Location troubleshootingInstallation Checklist VentingSequence Of Operation Flow Chart YESNOBurn Hazard Operational ProblemsFault and Alert Conditions Replacement PartsDiagnostic Checks Electrical Shock HazardResetting Control System Lock Outs Low Igniter Current AC ReversedIgnition Failure Blocked ExhaustBlocked Air Intake Blower Prover FailureBlower Prover Open Energy Cut Out ECOPage Page Page CLAIM PROCEDURE LIMITED RESIDENTIAL GAS WARRANTYSERVICE AND LABOR RESPONSIBILITY CONDITIONS AND EXCEPTIONSCopyright 2011 American Water Heaters. All rights reserved American Water Heater Product Service and SupportPO Box 1597, 500 Princeton Road Johnson City, TN