American Water Heater VG6250T100 instruction manual direct vent diagram

Page 30
direct vent diagram

direct vent diagram

12” MINIMUM CLEARANCE ABOVE HIGHEST ANTICIPATED SNOW LEVEL

Manual background 12” MINIMUM CLEARANCE ABOVE HIGHEST ANTICIPATED SNOW LEVEL

Figure 28.

Figure 29.

24” MINIMUM SEPARATION. EXHAUST MUST BE AT SAME LEVEL OR ABOVE INTAKE TERMINAL.

Figure 30.

Figure 31.

When direct venting through the wall, as shown in Figure 32, the exhaust should terminate a minimum of 24” from the intake vent terminal. The exhaust may be rotated up to 45 degrees left or right as long as the 24” distance is maintained.

The wire screen can be removed for space heating at cold climate installation to prevent potential air intake freeze up. If wire screen is removed during winter to prevent freezing it is recommended to re- install the screen during non-space heating seasons.

If necessary to achieve the 12” minimum clearance above the highest anticipated snow level or grade for the intake vent terminal install a snorkel, similar to the exhaust, in the up position. Maintain the 24” distance between the intake and exhaust terminations.

Optional cold climate sidewall direct vent kits are available: 318221-

Figure 32.

000 for 2” vent systems and 318222-000 for 3” vent systems.

 

30

Image 30
Contents RESIDENTIAL GAS WATER HEATERS For Your Safetywhenever maintenance adjustment or service is required Instruction Manualtable of contents safe installation, use and service APPROVALSDANGER Improper installation, use and service may result in property damage general safety informationPrecautions Explosion Hazardgeneral safety information Breathing Hazard - Carbon Monoxide Gas General Safety InformationFire or Explosion Hazard Electrical Shock HazardAbbreviations Used Preparing For The Installationintroduction QualificationsGet To Know Your Water Heater - Gas Models features and componentsREPLACEMENT PARTS AND DELIMING PRODUCTS Control AssemblyTable 1 - Rough-In-Dimensions installation considerationRough In Dimensions Table 2 - Capacity, Gas and Electrical CharacteristicsProperty Damage Hazard Locating The Water HeaterCombustion Air and Ventilation Insulation BlanketsUnconfined Space Outdoor Air Through Two Openings Confined SpaceFresh Air Openings For Confined Spaces Outdoor Air Through One OpeningOutdoor Air Through Two Horizontal Ducts Air From Other Indoor SpacesChemical Vapor Corrosion installing the new water heaterPower Supply Water PipingSpace Heating and Potable Water System Mixing ValvesDishwashing Machines Time to Produce 2nd & 3rdClosed Water Systems Thermal ExpansionT & P Valve and Pipe Insulation if supplied Temperature-Pressure Relief Valve Water Damage HazardExplosion Hazard T&P Valve Discharge Pipe RequirementsCondensate Piping Gas PipingSupply Gas Regulator SEDIMENT TRAPSHigh Altitude Installations Filling the Water HeaterIf using 3” inch vent pipe VentingIf using 2” inch vent pipe VENT PIPE TERMINATIONINSTALLATION OF VENT SYSTEM VENT TERMINAL INSTALLATION, SIDEWALLCommonwealth of Massachusetts Installation Requirements - Commonwealth of MassachusettsInstallation of Carbon Monoxide Detectors Approved Carbon Monoxide DetectorsTermination Clearances Sidewall Power Vent POWER VENTTermination Clearances Sidewall Direct Vent Vent Termination - Figure 15A DIRECT VENT terminal installation Installation SequenceSEQUENCE OF INSTALLATIONS, FIGURE 15A Figure 15BVERTICAL VENT TERMINAL INSTALLATION Flat Roof InstallationINSTALLATION PROCEDURE 1 ROOF TERMINATION, see Figure Concentric vent installationSAFETY CONSIDERATIONS Table 6 - KIT COMPONENTSCONCENTRIC TERMINATION FLAT ROOF CLEARANCE PROCEDURE 2 SIDE WALL TERMINATION, see FigureFigure 23A MULTI-CONCENTRIC VENT TERMINATIONS direct vent diagram 1. INITIAL PREPARATION Vent Pipe PreparationRECOMMENDED BRUSH* SIZE FOR PRIMER AND CEMENT APPLICATIONS 2. SELECTION OF MATERIALSSTEP F G. Cleanup and joint movement D. Inspection, cleaning, primingSTEP E F. Joint assembly B. DeburringBLOCKED EXHAUST SWITCH Controls and SwitchesBLOWER PROVER SWITCH BLOCKED INTAKE SWITCHTHIS WATER HEATER IS POLARITY SENSITVE BEFORE APPLYING Power Vent Wiring Schematic - FigureWIRE TO GROUND CHECK INDICATES ZERO VOLTAGE ELECTRICITY TO THIS HEATER BE CERTAIN THAT SUPPLY NEUTRALTO TURN OFF GAS TO APPLIANCE FOR YOUR SAFETY READ BEFORE LIGHTINGOPERATING INSTRUCTIONS WARNING TURN OFF ALL ELECTRIC POWER BEFORE SERVICINGTime to Produce temperature regulationHI LIMIT SWITCH ECO 2nd & 3rd DegreeOperating Set Point adjust user settingscontrol system operation 120FIcon DescriptionStatus Icons Operating States StateMenu Control System MenusHELP User Settings & Control System MenusMENU Main Menu140F Heater StatusTemperature Units Display SettingsHeater Information Backlight DelayRestore Factory Defaults Fault HistoryFault Occurrence Blocked ExhaustChange Contact Name Service Contact InformationShow Contact Information Current Contact InfoOperational Conditions for your informationStart Up Conditions SMOKE/ODORAnode Rod Inspection periodic maintenanceVenting System Inspection Temperature-Pressure Relief Valve OperationBurn harzard Hot water discharge ServiceDraining and Flushing Keep hands clear of drain valve dischargemaintenance Temperature-Pressure Relief Valve Testleakage checkpoints Water Heater Location troubleshootingInstallation Checklist VentingSequence Of Operation Flow Chart YESNOBurn Hazard Operational ProblemsFault and Alert Conditions Replacement PartsElectrical Shock Hazard Resetting Control System Lock OutsDiagnostic Checks Low Igniter Current AC ReversedIgnition Failure Blocked ExhaustBlocked Air Intake Blower Prover FailureBlower Prover Open Energy Cut Out ECOPage Page Page CLAIM PROCEDURE LIMITED RESIDENTIAL GAS WARRANTYSERVICE AND LABOR RESPONSIBILITY CONDITIONS AND EXCEPTIONSAmerican Water Heater Product Service and Support PO Box 1597, 500 Princeton Road Johnson City, TNCopyright 2011 American Water Heaters. All rights reserved