[c]SEQUENCE 1st Cycle
1.Unit energized and Control Switch to “ICE” position. Water supply cycle starts.
2.After 1 minute, Defrost cycle starts.
&
3.Thermistor reads 48° F. Defrost Timer starts counting.
IMPORTANT Water Valve opening is limited to 6 minutes.
5.After the first 5 minutes in freeze cycle. Ready to complete freeze cycle when Float Switch circuit opens.
IMPORTANT
Board never accepts freeze completion signal within the first 5 minutes in freeze cycle.
4.Defrost Timer stops counting.
Defrost cycle is completed and freeze cycle starts.
IMPORTANT
1.Board never accepts defrost completion signal within the first 2 minutes in defrost cycle.
2.Defrost cycle time is limited to 20 minutes even if Defrost Timer does not stop counting.
18