Manitowoc Ice 11M manual General Information, Section, This Page Intentionally Left Blank

Page 10
Manual background

General Information

Section 1

 

 

THIS PAGE INTENTIONALLY LEFT BLANK

1-4

Part Number 020001552 5/11

Image 10
Contents Model 11M Root Beer System Refrigeration Unit Installation, Use & Care ManualAmerica’s Quality Choice in Refrigeration Read These Before Proceeding Safety NoticesProcedural Notices PERSONAL INJURY POTENTIALAttention Marine Installations Table of Contents continued SectionSection Installation SpecificationsTower Installation Table of Contents continuedEquipment Placement Connecting Insulated ConduitBeverage System Cleaning Table of Contents continued Section MaintenanceSection Before Calling for Service Bag-In-BoxSystem SanitationTHIS PAGE INTENTIONALLY LEFT BLANK Section How to Read a Model NumberSection General Information Read This ManualATTENTION MARINE INSTALLATIONS AccessoriesSpecifications Special ApplicationsWarranty Information Serial Plate LocationSection General Section InstallationKit assembly includes UNPACKING AND INSPECTINGTop View InstallationDimensions and Clearances Side ViewREMOTE CONDENSER BLADE TOWERSafe Installation Dos and Don’ts RATINGS Location RequirementsCLEARANCES REQUIREMENTS FOR POST MIX UNITSElectrical Installer InstructionsSPECIFICATIONS Ambient Location RequirementGROUNDING INSTRUCTIONS PLUMBING REQUIREMENTS - GENERAL Plumbing/Water SupplyPLUMBING POTABLE WATER Drain Hose ConnectionPLUMBING CIRCUIT DIAGRAMS - MODEL 11M ROOT BEER Single Tower Plumbing2-10 Model 11M Root Beer Dual Tower Plumbing2-11 Model 11M Root Beer Three Tower PlumbingTOWER INSTALLATION Refrigeration Unit InstallationEQUIPMENT PLACEMENT CONNECTING INSULATED CONDUIT2-13 CONNECTING SUPPLY LINESConnecting conduit at the refrigeration unit Proceed with the Following Tests2-14 Proper John Guest Fitting InstallationConnect the drain PROPER USE OF JOHN GUEST FITTINGSModel 11M Connections 2-15Control Switches 2-16 Condenser and Pre-chargedLines InstallationAeroquip Connection INSULATING CONNECTIONS2-17 INSTALLING THE MULTIPLEX REMOTE CONDENSERPRE-CHARGEDREFRIGERATION LINE REQUIREMENTS TESTING SYRUP CIRCUIT 5 GALLON TANKS ONLY CONNECTING THE PRE-CHARGED REFRIGERATION LINESTESTING CO2 CIRCUIT FOR LEAKS 2-182-19 Start-UpPreparing Ice Bank BUILDING AN ICE BANKObserve the pump operations for leaks Installation Checklist2-20 Check the water bath for full ice bankTypical System Section OperationOperation Water FiltersHow the Multiplex Works WATER BATH ACCESSSERVICE ACCESS Sequence of OperationEQUIPMENT CLOSE PROCEDURE Equipment Setup and Close ProcedureEQUIPMENT SETUP PROCEDURE Start-upSection BEVERAGE SYSTEM CLEANING Section MaintenanceMaintenance SanitizingFIGAL BEVERAGE SYSTEM Back-flowPreventer Maintenance Shipping, Storage and RelocationSection Before Calling for Service Section Before Calling for ServiceChecklist Section Before Calling for ServiceTHIS PAGE INTENTIONALLY LEFT BLANK Page Part Number 020001552 5/11