Manitowoc Ice
11M
manual
Installation, Dimensions and Clearances, Top View, Side View, Front View
Specification
Install
Connecting Insulated Conduit
Warranty
Dimension
Maintenance
Water Bath Access
Equipment Setup Procedure
Checklist
How to
Page 12
Page 11
Page 13
Image 12
Page 11
Page 13
Contents
Installation, Use & Care Manual
Model 11M Root Beer System Refrigeration Unit
America’s Quality Choice in Refrigeration
Safety Notices
Procedural Notices
Read These Before Proceeding
PERSONAL INJURY POTENTIAL
Table of Contents continued Section
Section Installation
Attention Marine Installations
Specifications
Table of Contents continued
Equipment Placement
Tower Installation
Connecting Insulated Conduit
Table of Contents continued Section Maintenance
Section Before Calling for Service
Beverage System Cleaning
Bag-In-BoxSystem Sanitation
THIS PAGE INTENTIONALLY LEFT BLANK
How to Read a Model Number
Section General Information
Section
Read This Manual
Accessories
Specifications
ATTENTION MARINE INSTALLATIONS
Special Applications
Warranty Information
Serial Plate Location
General Information
Section Installation
Kit assembly includes
General
UNPACKING AND INSPECTING
Installation
Dimensions and Clearances
Top View
Side View
REMOTE CONDENSER
BLADE TOWER
Safe Installation Dos and Don’ts
Location Requirements
CLEARANCES
RATINGS
REQUIREMENTS FOR POST MIX UNITS
Installer Instructions
SPECIFICATIONS
Electrical
Ambient Location Requirement
GROUNDING INSTRUCTIONS
Plumbing/Water Supply
PLUMBING POTABLE WATER
PLUMBING REQUIREMENTS - GENERAL
Drain Hose Connection
PLUMBING CIRCUIT DIAGRAMS - MODEL 11M ROOT BEER
Single Tower Plumbing
2-10
Model 11M Root Beer Dual Tower Plumbing
2-11
Model 11M Root Beer Three Tower Plumbing
Refrigeration Unit Installation
EQUIPMENT PLACEMENT
TOWER INSTALLATION
CONNECTING INSULATED CONDUIT
CONNECTING SUPPLY LINES
Connecting conduit at the refrigeration unit
2-13
Proceed with the Following Tests
Proper John Guest Fitting Installation
Connect the drain
2-14
PROPER USE OF JOHN GUEST FITTINGS
2-15
Model 11M Connections
Control Switches
Condenser and Pre-chargedLines Installation
Aeroquip Connection
2-16
INSULATING CONNECTIONS
INSTALLING THE MULTIPLEX REMOTE CONDENSER
2-17
PRE-CHARGEDREFRIGERATION LINE REQUIREMENTS
CONNECTING THE PRE-CHARGED REFRIGERATION LINES
TESTING CO2 CIRCUIT FOR LEAKS
TESTING SYRUP CIRCUIT 5 GALLON TANKS ONLY
2-18
Start-Up
Preparing Ice Bank
2-19
BUILDING AN ICE BANK
Installation Checklist
2-20
Observe the pump operations for leaks
Check the water bath for full ice bank
Section Operation
Operation
Typical System
Water Filters
WATER BATH ACCESS
SERVICE ACCESS
How the Multiplex Works
Sequence of Operation
Equipment Setup and Close Procedure
EQUIPMENT SETUP PROCEDURE
EQUIPMENT CLOSE PROCEDURE
Start-up
Operation
Section Maintenance
Maintenance
BEVERAGE SYSTEM CLEANING
Sanitizing
FIGAL BEVERAGE SYSTEM
Back-flowPreventer Maintenance
Shipping, Storage and Relocation
Maintenance
Section Before Calling for Service
Before Calling for Service
Checklist
Before Calling for Service
Section
THIS PAGE INTENTIONALLY LEFT BLANK
Page
Part Number 020001552 5/11
Related pages
All Install page
Uninstall program will prompt you to restart Windows for Hi-Touch Imaging Technologies 640PS
Printer Not Found screen appears during installation for HP C4580
Detecting Installed Hard Drive for Q-See QSD004
Typical DVR Installation for Honeywell HRDE4X4
VI. Software Installation for Jasco 97845
Installation for Heath Zenith SL-6105
Installing the Motherboard for Toshiba A350
Removing and Installing the Chassis Cover for Intel SC5400
On-Ceiling Mount Type Installation Example for Samsung SCP-3120
What type of wall mount hardware is recommended for the Dell U2913WM?
Learn more
Top
Page
Image
Contents