Manitowoc Ice 11M manual Table of Contents continued, This Page Intentionally Left Blank

Page 6
THIS PAGE INTENTIONALLY LEFT BLANK

Table of Contents (continued)

THIS PAGE INTENTIONALLY LEFT BLANK

iv

Part Number 020001552 5/11

Image 6
Contents Installation, Use & Care Manual Model 11M Root Beer System Refrigeration UnitAmerica’s Quality Choice in Refrigeration Read These Before Proceeding Safety NoticesProcedural Notices PERSONAL INJURY POTENTIALAttention Marine Installations Table of Contents continued SectionSection Installation SpecificationsTower Installation Table of Contents continuedEquipment Placement Connecting Insulated ConduitBeverage System Cleaning Table of Contents continued Section MaintenanceSection Before Calling for Service Bag-In-BoxSystem SanitationTHIS PAGE INTENTIONALLY LEFT BLANK Section How to Read a Model NumberSection General Information Read This ManualATTENTION MARINE INSTALLATIONS AccessoriesSpecifications Special ApplicationsWarranty Information Serial Plate LocationGeneral Information General Section InstallationKit assembly includes UNPACKING AND INSPECTINGTop View InstallationDimensions and Clearances Side ViewREMOTE CONDENSER BLADE TOWERSafe Installation Dos and Don’ts RATINGS Location RequirementsCLEARANCES REQUIREMENTS FOR POST MIX UNITSElectrical Installer InstructionsSPECIFICATIONS Ambient Location RequirementGROUNDING INSTRUCTIONS PLUMBING REQUIREMENTS - GENERAL Plumbing/Water SupplyPLUMBING POTABLE WATER Drain Hose ConnectionPLUMBING CIRCUIT DIAGRAMS - MODEL 11M ROOT BEER Single Tower Plumbing2-10 Model 11M Root Beer Dual Tower Plumbing2-11 Model 11M Root Beer Three Tower PlumbingTOWER INSTALLATION Refrigeration Unit InstallationEQUIPMENT PLACEMENT CONNECTING INSULATED CONDUIT2-13 CONNECTING SUPPLY LINESConnecting conduit at the refrigeration unit Proceed with the Following Tests2-14 Proper John Guest Fitting InstallationConnect the drain PROPER USE OF JOHN GUEST FITTINGS2-15 Model 11M ConnectionsControl Switches 2-16 Condenser and Pre-chargedLines InstallationAeroquip Connection INSULATING CONNECTIONSINSTALLING THE MULTIPLEX REMOTE CONDENSER 2-17PRE-CHARGEDREFRIGERATION LINE REQUIREMENTS TESTING SYRUP CIRCUIT 5 GALLON TANKS ONLY CONNECTING THE PRE-CHARGED REFRIGERATION LINESTESTING CO2 CIRCUIT FOR LEAKS 2-182-19 Start-UpPreparing Ice Bank BUILDING AN ICE BANKObserve the pump operations for leaks Installation Checklist2-20 Check the water bath for full ice bankTypical System Section OperationOperation Water FiltersHow the Multiplex Works WATER BATH ACCESSSERVICE ACCESS Sequence of OperationEQUIPMENT CLOSE PROCEDURE Equipment Setup and Close ProcedureEQUIPMENT SETUP PROCEDURE Start-upOperation BEVERAGE SYSTEM CLEANING Section MaintenanceMaintenance SanitizingFIGAL BEVERAGE SYSTEM Back-flowPreventer Maintenance Shipping, Storage and RelocationMaintenance Section Before Calling for Service Before Calling for ServiceChecklist Before Calling for Service SectionTHIS PAGE INTENTIONALLY LEFT BLANK Page Part Number 020001552 5/11