Manitowoc Ice 11M manual Installer Instructions, Electrical, Ambient Location Requirement, General

Page 16
Installer Instructions

Installation

Section 2

 

 

Installer Instructions

Important

The remainder of these instructions is to be completed by an authorized Multiplex Installer.

Ambient Location Requirement

This equipment is rated for indoor use only. It will not operate in sub-freezing temperature. In a situation when temperatures drop below freezing, the equipment must be turned off immediately and properly winterized. Contact the manufacturer for winterization process.

These equipment instructions are intended to assist qualified personnel in the unpacking, locating and the initial operation of the Multiplex Beverage Equipment Post Mix Refrigeration Unit.

Electrical

GENERAL

Important

This publication must be saved for future reference. Read instructions before attempting installation.

PREPARATION

The Multiplex Beverage Equipment Post Mix Refrigeration Unit is pre-assembled in the factory and requires minimum installation.

For future reference or to be used when ordering parts, record the Model Number, Serial Number, Part Numbers of Unit, Condenser (if remote), Towers, etc., and Date of Installation on the inside of this Manual. Leave manual on site in a safe place. Do not discard manual.

SPECIFICATIONS

!Warning

All wiring must conform to local, state and national codes.

MINIMUM CIRCUIT AMPACITY

The minimum circuit ampacity is used to help select the wire size of the electrical supply. (Minimum circuit ampacity is not the beverage/ice machine’s running amp load.) The wire size (or gauge) is also dependent upon location, materials used, length of run, etc., so it must be determined by a qualified electrician.

ELECTRICAL REQUIREMENTS

Refer to Ice Machine Model/Serial Plate for voltage/amperage specifications.

Model

Volt/Cycle/Phase

Minimum Circuit Amps

Breaker

Compressor

 

 

 

 

 

11M

120/60/1

21.5

30A

1/2 hp

 

230/50/1

10.7

16A

.97 kW

 

 

 

 

 

2-6

Part Number 020001552 5/11

Image 16
Contents Model 11M Root Beer System Refrigeration Unit Installation, Use & Care ManualAmerica’s Quality Choice in Refrigeration Safety Notices Procedural NoticesRead These Before Proceeding PERSONAL INJURY POTENTIALTable of Contents continued Section Section InstallationAttention Marine Installations SpecificationsTable of Contents continued Equipment PlacementTower Installation Connecting Insulated ConduitTable of Contents continued Section Maintenance Section Before Calling for ServiceBeverage System Cleaning Bag-In-BoxSystem SanitationTHIS PAGE INTENTIONALLY LEFT BLANK How to Read a Model Number Section General InformationSection Read This ManualAccessories SpecificationsATTENTION MARINE INSTALLATIONS Special ApplicationsWarranty Information Serial Plate LocationSection Section Installation Kit assembly includesGeneral UNPACKING AND INSPECTINGInstallation Dimensions and ClearancesTop View Side ViewREMOTE CONDENSER BLADE TOWERSafe Installation Dos and Don’ts Location Requirements CLEARANCESRATINGS REQUIREMENTS FOR POST MIX UNITSInstaller Instructions SPECIFICATIONSElectrical Ambient Location RequirementGROUNDING INSTRUCTIONS Plumbing/Water Supply PLUMBING POTABLE WATERPLUMBING REQUIREMENTS - GENERAL Drain Hose ConnectionPLUMBING CIRCUIT DIAGRAMS - MODEL 11M ROOT BEER Single Tower Plumbing2-10 Model 11M Root Beer Dual Tower Plumbing2-11 Model 11M Root Beer Three Tower PlumbingRefrigeration Unit Installation EQUIPMENT PLACEMENTTOWER INSTALLATION CONNECTING INSULATED CONDUITCONNECTING SUPPLY LINES Connecting conduit at the refrigeration unit2-13 Proceed with the Following TestsProper John Guest Fitting Installation Connect the drain2-14 PROPER USE OF JOHN GUEST FITTINGSModel 11M Connections 2-15Control Switches Condenser and Pre-chargedLines Installation Aeroquip Connection2-16 INSULATING CONNECTIONS2-17 INSTALLING THE MULTIPLEX REMOTE CONDENSERPRE-CHARGEDREFRIGERATION LINE REQUIREMENTS CONNECTING THE PRE-CHARGED REFRIGERATION LINES TESTING CO2 CIRCUIT FOR LEAKSTESTING SYRUP CIRCUIT 5 GALLON TANKS ONLY 2-18Start-Up Preparing Ice Bank2-19 BUILDING AN ICE BANKInstallation Checklist 2-20Observe the pump operations for leaks Check the water bath for full ice bankSection Operation OperationTypical System Water FiltersWATER BATH ACCESS SERVICE ACCESSHow the Multiplex Works Sequence of OperationEquipment Setup and Close Procedure EQUIPMENT SETUP PROCEDUREEQUIPMENT CLOSE PROCEDURE Start-upSection Section Maintenance MaintenanceBEVERAGE SYSTEM CLEANING SanitizingFIGAL BEVERAGE SYSTEM Back-flowPreventer Maintenance Shipping, Storage and RelocationSection Before Calling for Service Section Before Calling for ServiceChecklist Section Before Calling for ServiceTHIS PAGE INTENTIONALLY LEFT BLANK Page Part Number 020001552 5/11