Manitowoc Ice 11M manual

Page 41
Manual background
Image 41
Contents America’s Quality Choice in Refrigeration Installation, Use & Care ManualModel 11M Root Beer System Refrigeration Unit Procedural Notices Safety NoticesRead These Before Proceeding PERSONAL INJURY POTENTIALSection Installation Table of Contents continued SectionAttention Marine Installations SpecificationsEquipment Placement Table of Contents continuedTower Installation Connecting Insulated ConduitSection Before Calling for Service Table of Contents continued Section MaintenanceBeverage System Cleaning Bag-In-BoxSystem SanitationTHIS PAGE INTENTIONALLY LEFT BLANK Section General Information How to Read a Model NumberSection Read This ManualSpecifications AccessoriesATTENTION MARINE INSTALLATIONS Special ApplicationsSerial Plate Location Warranty InformationTHIS PAGE INTENTIONALLY LEFT BLANK Kit assembly includes Section InstallationGeneral UNPACKING AND INSPECTINGDimensions and Clearances InstallationTop View Side ViewBLADE TOWER REMOTE CONDENSERSafe Installation Dos and Don’ts CLEARANCES Location RequirementsRATINGS REQUIREMENTS FOR POST MIX UNITSSPECIFICATIONS Installer InstructionsElectrical Ambient Location RequirementGROUNDING INSTRUCTIONS PLUMBING POTABLE WATER Plumbing/Water SupplyPLUMBING REQUIREMENTS - GENERAL Drain Hose ConnectionSingle Tower Plumbing PLUMBING CIRCUIT DIAGRAMS - MODEL 11M ROOT BEERModel 11M Root Beer Dual Tower Plumbing 2-10Model 11M Root Beer Three Tower Plumbing 2-11EQUIPMENT PLACEMENT Refrigeration Unit InstallationTOWER INSTALLATION CONNECTING INSULATED CONDUITConnecting conduit at the refrigeration unit CONNECTING SUPPLY LINES2-13 Proceed with the Following TestsConnect the drain Proper John Guest Fitting Installation2-14 PROPER USE OF JOHN GUEST FITTINGSControl Switches 2-15Model 11M Connections Aeroquip Connection Condenser and Pre-chargedLines Installation2-16 INSULATING CONNECTIONSPRE-CHARGEDREFRIGERATION LINE REQUIREMENTS INSTALLING THE MULTIPLEX REMOTE CONDENSER2-17 TESTING CO2 CIRCUIT FOR LEAKS CONNECTING THE PRE-CHARGED REFRIGERATION LINESTESTING SYRUP CIRCUIT 5 GALLON TANKS ONLY 2-18Preparing Ice Bank Start-Up2-19 BUILDING AN ICE BANK2-20 Installation ChecklistObserve the pump operations for leaks Check the water bath for full ice bankOperation Section OperationTypical System Water FiltersSERVICE ACCESS WATER BATH ACCESSHow the Multiplex Works Sequence of OperationEQUIPMENT SETUP PROCEDURE Equipment Setup and Close ProcedureEQUIPMENT CLOSE PROCEDURE Start-upTHIS PAGE INTENTIONALLY LEFT BLANK Maintenance Section MaintenanceBEVERAGE SYSTEM CLEANING SanitizingFIGAL BEVERAGE SYSTEM Shipping, Storage and Relocation Back-flowPreventer MaintenanceTHIS PAGE INTENTIONALLY LEFT BLANK Checklist Section Before Calling for ServiceBefore Calling for Service THIS PAGE INTENTIONALLY LEFT BLANK Before Calling for ServiceSection Page Part Number 020001552 5/11