Manitowoc Ice
manual
2-11, Model 11M Root Beer Three Tower Plumbing, Section, Installation
Specification
Install
Connecting Insulated Conduit
Warranty
Dimension
Maintenance
Water Bath Access
Equipment Setup Procedure
Checklist
How to
Page 21
Page 20
Page 22
Image 21
Page 20
Page 22
Contents
Installation, Use & Care Manual
Model 11M Root Beer System Refrigeration Unit
America’s Quality Choice in Refrigeration
Procedural Notices
Safety Notices
Read These Before Proceeding
PERSONAL INJURY POTENTIAL
Section Installation
Table of Contents continued Section
Attention Marine Installations
Specifications
Equipment Placement
Table of Contents continued
Tower Installation
Connecting Insulated Conduit
Section Before Calling for Service
Table of Contents continued Section Maintenance
Beverage System Cleaning
Bag-In-BoxSystem Sanitation
THIS PAGE INTENTIONALLY LEFT BLANK
Section General Information
How to Read a Model Number
Section
Read This Manual
Specifications
Accessories
ATTENTION MARINE INSTALLATIONS
Special Applications
Serial Plate Location
Warranty Information
General Information
Kit assembly includes
Section Installation
General
UNPACKING AND INSPECTING
Dimensions and Clearances
Installation
Top View
Side View
BLADE TOWER
REMOTE CONDENSER
Safe Installation Dos and Don’ts
CLEARANCES
Location Requirements
RATINGS
REQUIREMENTS FOR POST MIX UNITS
SPECIFICATIONS
Installer Instructions
Electrical
Ambient Location Requirement
GROUNDING INSTRUCTIONS
PLUMBING POTABLE WATER
Plumbing/Water Supply
PLUMBING REQUIREMENTS - GENERAL
Drain Hose Connection
Single Tower Plumbing
PLUMBING CIRCUIT DIAGRAMS - MODEL 11M ROOT BEER
Model 11M Root Beer Dual Tower Plumbing
2-10
Model 11M Root Beer Three Tower Plumbing
2-11
EQUIPMENT PLACEMENT
Refrigeration Unit Installation
TOWER INSTALLATION
CONNECTING INSULATED CONDUIT
Connecting conduit at the refrigeration unit
CONNECTING SUPPLY LINES
2-13
Proceed with the Following Tests
Connect the drain
Proper John Guest Fitting Installation
2-14
PROPER USE OF JOHN GUEST FITTINGS
2-15
Model 11M Connections
Control Switches
Aeroquip Connection
Condenser and Pre-chargedLines Installation
2-16
INSULATING CONNECTIONS
INSTALLING THE MULTIPLEX REMOTE CONDENSER
2-17
PRE-CHARGEDREFRIGERATION LINE REQUIREMENTS
TESTING CO2 CIRCUIT FOR LEAKS
CONNECTING THE PRE-CHARGED REFRIGERATION LINES
TESTING SYRUP CIRCUIT 5 GALLON TANKS ONLY
2-18
Preparing Ice Bank
Start-Up
2-19
BUILDING AN ICE BANK
2-20
Installation Checklist
Observe the pump operations for leaks
Check the water bath for full ice bank
Operation
Section Operation
Typical System
Water Filters
SERVICE ACCESS
WATER BATH ACCESS
How the Multiplex Works
Sequence of Operation
EQUIPMENT SETUP PROCEDURE
Equipment Setup and Close Procedure
EQUIPMENT CLOSE PROCEDURE
Start-up
Operation
Maintenance
Section Maintenance
BEVERAGE SYSTEM CLEANING
Sanitizing
FIGAL BEVERAGE SYSTEM
Shipping, Storage and Relocation
Back-flowPreventer Maintenance
Maintenance
Section Before Calling for Service
Before Calling for Service
Checklist
Before Calling for Service
Section
THIS PAGE INTENTIONALLY LEFT BLANK
Page
Part Number 020001552 5/11
Related pages
All Install page
Telephone base and charger installation for VTech CS6629/CS6629-2/CS6629-3
Installation for Alliance Laundry Systems Dishwasher
Windows Installing a USB printer for Freecom Technologies Storage Gateway NETWORK HARD DRIVE
INSTALLATION for Field Controls SK-1
Installing the Stand for Samsung LS23A300NS/CI
Installing the motherboard to the chassis for Gigabyte GA-8IR2003
Congratulations! The hard drive installation is complete for Airlink101 ANAS550
Electrical Installation -- Europe for Cal Spas LTR20121002
Installation Notes for Cisco Systems AIR-ANTM4050V-R
Extended Length Installations for Xantrex Technology TM500A
How to reset my
Samsung monitor
if it’s stuck in demo mode?
Top
Page
Image
Contents