Manitowoc Ice
11M
manual
Accessories, Special Applications, Specifications, Outdoor Applications
Specifications
Install
Connecting Insulated Conduit
Warranty
Dimension
Maintenance
Water Bath Access
Equipment Setup Procedure
Checklist
How to
Page 8
Page 7
Page 9
Image 8
Page 7
Page 9
Contents
America’s Quality Choice in Refrigeration
Installation, Use & Care Manual
Model 11M Root Beer System Refrigeration Unit
Safety Notices
Procedural Notices
Read These Before Proceeding
PERSONAL INJURY POTENTIAL
Table of Contents continued Section
Section Installation
Attention Marine Installations
Specifications
Table of Contents continued
Equipment Placement
Tower Installation
Connecting Insulated Conduit
Table of Contents continued Section Maintenance
Section Before Calling for Service
Beverage System Cleaning
Bag-In-BoxSystem Sanitation
THIS PAGE INTENTIONALLY LEFT BLANK
How to Read a Model Number
Section General Information
Section
Read This Manual
Accessories
Specifications
ATTENTION MARINE INSTALLATIONS
Special Applications
Warranty Information
Serial Plate Location
THIS PAGE INTENTIONALLY LEFT BLANK
Section Installation
Kit assembly includes
General
UNPACKING AND INSPECTING
Installation
Dimensions and Clearances
Top View
Side View
REMOTE CONDENSER
BLADE TOWER
Safe Installation Dos and Don’ts
Location Requirements
CLEARANCES
RATINGS
REQUIREMENTS FOR POST MIX UNITS
Installer Instructions
SPECIFICATIONS
Electrical
Ambient Location Requirement
GROUNDING INSTRUCTIONS
Plumbing/Water Supply
PLUMBING POTABLE WATER
PLUMBING REQUIREMENTS - GENERAL
Drain Hose Connection
PLUMBING CIRCUIT DIAGRAMS - MODEL 11M ROOT BEER
Single Tower Plumbing
2-10
Model 11M Root Beer Dual Tower Plumbing
2-11
Model 11M Root Beer Three Tower Plumbing
Refrigeration Unit Installation
EQUIPMENT PLACEMENT
TOWER INSTALLATION
CONNECTING INSULATED CONDUIT
CONNECTING SUPPLY LINES
Connecting conduit at the refrigeration unit
2-13
Proceed with the Following Tests
Proper John Guest Fitting Installation
Connect the drain
2-14
PROPER USE OF JOHN GUEST FITTINGS
Control Switches
2-15
Model 11M Connections
Condenser and Pre-chargedLines Installation
Aeroquip Connection
2-16
INSULATING CONNECTIONS
PRE-CHARGEDREFRIGERATION LINE REQUIREMENTS
INSTALLING THE MULTIPLEX REMOTE CONDENSER
2-17
CONNECTING THE PRE-CHARGED REFRIGERATION LINES
TESTING CO2 CIRCUIT FOR LEAKS
TESTING SYRUP CIRCUIT 5 GALLON TANKS ONLY
2-18
Start-Up
Preparing Ice Bank
2-19
BUILDING AN ICE BANK
Installation Checklist
2-20
Observe the pump operations for leaks
Check the water bath for full ice bank
Section Operation
Operation
Typical System
Water Filters
WATER BATH ACCESS
SERVICE ACCESS
How the Multiplex Works
Sequence of Operation
Equipment Setup and Close Procedure
EQUIPMENT SETUP PROCEDURE
EQUIPMENT CLOSE PROCEDURE
Start-up
THIS PAGE INTENTIONALLY LEFT BLANK
Section Maintenance
Maintenance
BEVERAGE SYSTEM CLEANING
Sanitizing
FIGAL BEVERAGE SYSTEM
Back-flowPreventer Maintenance
Shipping, Storage and Relocation
THIS PAGE INTENTIONALLY LEFT BLANK
Checklist
Section Before Calling for Service
Before Calling for Service
THIS PAGE INTENTIONALLY LEFT BLANK
Before Calling for Service
Section
Page
Part Number 020001552 5/11
Related pages
All Specification page
Technical Specifications for Electrolux U21312
Specifications for Wilton FK350-2SX
Specifications and Other Information for Samsung UE65KU6000KXZT
Appendix C Specification for Palsonic TFTV-151
Specifications for SCI Scandicrafts A2840/R
Specifications for Panasonic CQ-4330U
Section Description and Specifications for Emerson 4000
Specifications for Acu-Rite 1604
Product Specifications for ADTRAN Quad BNC
Technical specifications for Samsung MS23F301TAK/BA
Is there an animation available for clearing paper jams in the Samsung CLP-775 series?
Watch it now
Top
Page
Image
Contents