Manitowoc Ice 11M manual Section Operation, Typical System, Water Filters

Page 31
Operation

Section 3

Operation

 

 

Section 3

Operation

Typical System

Conduit (In Wall)

Water Booster

6 Valve Soda Tower

BIB Pumps

8 Valve Soda Tower

Air Compressor

Conduit

CO2 Panel

Multiplex

Refrigeration

Unit

CO2 Tank

Bag-In-Box

Water Filters

(BIB) Syrup

 

BIB Rack

Multiplex Pre-mix Beverage System Operation and Layout

Part Number 020001552 5/11

3-1

Image 31
Contents Model 11M Root Beer System Refrigeration Unit Installation, Use & Care ManualAmerica’s Quality Choice in Refrigeration PERSONAL INJURY POTENTIAL Safety NoticesProcedural Notices Read These Before ProceedingSpecifications Table of Contents continued SectionSection Installation Attention Marine InstallationsConnecting Insulated Conduit Table of Contents continuedEquipment Placement Tower InstallationBag-In-BoxSystem Sanitation Table of Contents continued Section MaintenanceSection Before Calling for Service Beverage System CleaningTHIS PAGE INTENTIONALLY LEFT BLANK Read This Manual How to Read a Model NumberSection General Information SectionSpecial Applications AccessoriesSpecifications ATTENTION MARINE INSTALLATIONSSerial Plate Location Warranty InformationSection UNPACKING AND INSPECTING Section InstallationKit assembly includes GeneralSide View InstallationDimensions and Clearances Top ViewBLADE TOWER REMOTE CONDENSERSafe Installation Dos and Don’ts REQUIREMENTS FOR POST MIX UNITS Location RequirementsCLEARANCES RATINGSAmbient Location Requirement Installer InstructionsSPECIFICATIONS ElectricalGROUNDING INSTRUCTIONS Drain Hose Connection Plumbing/Water SupplyPLUMBING POTABLE WATER PLUMBING REQUIREMENTS - GENERALSingle Tower Plumbing PLUMBING CIRCUIT DIAGRAMS - MODEL 11M ROOT BEERModel 11M Root Beer Dual Tower Plumbing 2-10Model 11M Root Beer Three Tower Plumbing 2-11CONNECTING INSULATED CONDUIT Refrigeration Unit InstallationEQUIPMENT PLACEMENT TOWER INSTALLATIONProceed with the Following Tests CONNECTING SUPPLY LINESConnecting conduit at the refrigeration unit 2-13PROPER USE OF JOHN GUEST FITTINGS Proper John Guest Fitting InstallationConnect the drain 2-14Model 11M Connections 2-15Control Switches INSULATING CONNECTIONS Condenser and Pre-chargedLines InstallationAeroquip Connection 2-162-17 INSTALLING THE MULTIPLEX REMOTE CONDENSERPRE-CHARGEDREFRIGERATION LINE REQUIREMENTS 2-18 CONNECTING THE PRE-CHARGED REFRIGERATION LINESTESTING CO2 CIRCUIT FOR LEAKS TESTING SYRUP CIRCUIT 5 GALLON TANKS ONLYBUILDING AN ICE BANK Start-UpPreparing Ice Bank 2-19Check the water bath for full ice bank Installation Checklist2-20 Observe the pump operations for leaksWater Filters Section OperationOperation Typical SystemSequence of Operation WATER BATH ACCESSSERVICE ACCESS How the Multiplex WorksStart-up Equipment Setup and Close ProcedureEQUIPMENT SETUP PROCEDURE EQUIPMENT CLOSE PROCEDURESection Sanitizing Section MaintenanceMaintenance BEVERAGE SYSTEM CLEANINGFIGAL BEVERAGE SYSTEM Shipping, Storage and Relocation Back-flowPreventer MaintenanceSection Before Calling for Service Section Before Calling for ServiceChecklist Section Before Calling for ServiceTHIS PAGE INTENTIONALLY LEFT BLANK Page Part Number 020001552 5/11