Model 11M Root Beer System Refrigeration Unit
Installation, Use & Care Manual
America’s Quality Choice in Refrigeration
PERSONAL INJURY POTENTIAL
Safety Notices
Procedural Notices
Read These Before Proceeding
Specifications
Table of Contents continued Section
Section Installation
Attention Marine Installations
Connecting Insulated Conduit
Table of Contents continued
Equipment Placement
Tower Installation
Bag-In-BoxSystem Sanitation
Table of Contents continued Section Maintenance
Section Before Calling for Service
Beverage System Cleaning
THIS PAGE INTENTIONALLY LEFT BLANK
Read This Manual
How to Read a Model Number
Section General Information
Section
Special Applications
Accessories
Specifications
ATTENTION MARINE INSTALLATIONS
Serial Plate Location
Warranty Information
Section
UNPACKING AND INSPECTING
Section Installation
Kit assembly includes
General
Side View
Installation
Dimensions and Clearances
Top View
BLADE TOWER
REMOTE CONDENSER
Safe Installation Dos and Don’ts
REQUIREMENTS FOR POST MIX UNITS
Location Requirements
CLEARANCES
RATINGS
Ambient Location Requirement
Installer Instructions
SPECIFICATIONS
Electrical
GROUNDING INSTRUCTIONS
Drain Hose Connection
Plumbing/Water Supply
PLUMBING POTABLE WATER
PLUMBING REQUIREMENTS - GENERAL
Single Tower Plumbing
PLUMBING CIRCUIT DIAGRAMS - MODEL 11M ROOT BEER
Model 11M Root Beer Dual Tower Plumbing
2-10
Model 11M Root Beer Three Tower Plumbing
2-11
CONNECTING INSULATED CONDUIT
Refrigeration Unit Installation
EQUIPMENT PLACEMENT
TOWER INSTALLATION
Proceed with the Following Tests
CONNECTING SUPPLY LINES
Connecting conduit at the refrigeration unit
2-13
PROPER USE OF JOHN GUEST FITTINGS
Proper John Guest Fitting Installation
Connect the drain
2-14
Model 11M Connections
2-15
Control Switches
INSULATING CONNECTIONS
Condenser and Pre-chargedLines Installation
Aeroquip Connection
2-16
2-17
INSTALLING THE MULTIPLEX REMOTE CONDENSER
PRE-CHARGEDREFRIGERATION LINE REQUIREMENTS
2-18
CONNECTING THE PRE-CHARGED REFRIGERATION LINES
TESTING CO2 CIRCUIT FOR LEAKS
TESTING SYRUP CIRCUIT 5 GALLON TANKS ONLY
BUILDING AN ICE BANK
Start-Up
Preparing Ice Bank
2-19
Check the water bath for full ice bank
Installation Checklist
2-20
Observe the pump operations for leaks
Water Filters
Section Operation
Operation
Typical System
Sequence of Operation
WATER BATH ACCESS
SERVICE ACCESS
How the Multiplex Works
Start-up
Equipment Setup and Close Procedure
EQUIPMENT SETUP PROCEDURE
EQUIPMENT CLOSE PROCEDURE
Section
Sanitizing
Section Maintenance
Maintenance
BEVERAGE SYSTEM CLEANING
FIGAL BEVERAGE SYSTEM
Shipping, Storage and Relocation
Back-flowPreventer Maintenance
Section
Before Calling for Service
Section Before Calling for Service
Checklist
Section
Before Calling for Service
THIS PAGE INTENTIONALLY LEFT BLANK
Page
Part Number 020001552 5/11
Related pages
All How to page
Select Folder Where Temporary Files are Saved for Canon LiDE 700F
How to Sharpen Knives for GE 681131066235
How to change the bulb for Zanussi ZRB 2941
EN Connections When Using Jlip Playe r Soft ware for JVC LYT0002-0H6B
When the appliance is not in use for Zanussi ZI 9121 FA
Do you see OSD Locked when you push Menu button? for LG Electronics W2600V
When you are finished exercising, the console for ProForm PFEL6026.0
How to Configure WPA for NETGEAR CG814WG V3
Case When the recording paper has jammed near the fuser unit for Panasonic KX-FLB851
How do I install the audio driver on my MSI Z77A-GD65 motherboard?
link
Top
Page
Image
Contents