Manitowoc Ice 11M manual 2-13, Connecting Supply Lines, Proceed with the Following Tests, Section

Page 23
Image 23
Contents America’s Quality Choice in Refrigeration Installation, Use & Care ManualModel 11M Root Beer System Refrigeration Unit PERSONAL INJURY POTENTIAL Safety NoticesProcedural Notices Read These Before ProceedingSpecifications Table of Contents continued SectionSection Installation Attention Marine InstallationsConnecting Insulated Conduit Table of Contents continuedEquipment Placement Tower InstallationBag-In-BoxSystem Sanitation Table of Contents continued Section MaintenanceSection Before Calling for Service Beverage System CleaningTHIS PAGE INTENTIONALLY LEFT BLANK Read This Manual How to Read a Model NumberSection General Information SectionSpecial Applications AccessoriesSpecifications ATTENTION MARINE INSTALLATIONSSerial Plate Location Warranty InformationTHIS PAGE INTENTIONALLY LEFT BLANK UNPACKING AND INSPECTING Section InstallationKit assembly includes GeneralSide View InstallationDimensions and Clearances Top ViewBLADE TOWER REMOTE CONDENSERSafe Installation Dos and Don’ts REQUIREMENTS FOR POST MIX UNITS Location RequirementsCLEARANCES RATINGSAmbient Location Requirement Installer InstructionsSPECIFICATIONS ElectricalGROUNDING INSTRUCTIONS Drain Hose Connection Plumbing/Water SupplyPLUMBING POTABLE WATER PLUMBING REQUIREMENTS - GENERALSingle Tower Plumbing PLUMBING CIRCUIT DIAGRAMS - MODEL 11M ROOT BEERModel 11M Root Beer Dual Tower Plumbing 2-10Model 11M Root Beer Three Tower Plumbing 2-11CONNECTING INSULATED CONDUIT Refrigeration Unit InstallationEQUIPMENT PLACEMENT TOWER INSTALLATIONProceed with the Following Tests CONNECTING SUPPLY LINESConnecting conduit at the refrigeration unit 2-13PROPER USE OF JOHN GUEST FITTINGS Proper John Guest Fitting InstallationConnect the drain 2-14Control Switches 2-15Model 11M Connections INSULATING CONNECTIONS Condenser and Pre-chargedLines InstallationAeroquip Connection 2-16PRE-CHARGEDREFRIGERATION LINE REQUIREMENTS INSTALLING THE MULTIPLEX REMOTE CONDENSER2-17 2-18 CONNECTING THE PRE-CHARGED REFRIGERATION LINESTESTING CO2 CIRCUIT FOR LEAKS TESTING SYRUP CIRCUIT 5 GALLON TANKS ONLYBUILDING AN ICE BANK Start-UpPreparing Ice Bank 2-19Check the water bath for full ice bank Installation Checklist2-20 Observe the pump operations for leaksWater Filters Section OperationOperation Typical SystemSequence of Operation WATER BATH ACCESSSERVICE ACCESS How the Multiplex WorksStart-up Equipment Setup and Close ProcedureEQUIPMENT SETUP PROCEDURE EQUIPMENT CLOSE PROCEDURETHIS PAGE INTENTIONALLY LEFT BLANK Sanitizing Section MaintenanceMaintenance BEVERAGE SYSTEM CLEANINGFIGAL BEVERAGE SYSTEM Shipping, Storage and Relocation Back-flowPreventer MaintenanceTHIS PAGE INTENTIONALLY LEFT BLANK Checklist Section Before Calling for ServiceBefore Calling for Service THIS PAGE INTENTIONALLY LEFT BLANK Before Calling for ServiceSection Page Part Number 020001552 5/11