
Table of Contents (continued)
Refrigeration Unit Installation |
|
Positioning of Refrigeration Unit | |
Equipment Placement | |
Electrical Connections | |
Tower Installation | |
Routing Insulated Conduit | |
Connecting Insulated Conduit | |
Connecting Supply Lines |
|
Connect the drain |
|
Proper Use of John Guest Fittings | |
Insulating Connections |
|
Aeroquip Connection | |
Condenser and | |
Remote Condenser Requirements | |
|
|
Installing the Multiplex Remote Condenser | |
Connecting the |
|
Testing CO2 Circuit for Leaks | |
Testing Syrup Circuit (5 gallon tanks only) | |
| |
Preparing Ice Bank | |
Building an Ice Bank | |
Installation Checklist |
|
Section 3
Operation
Typical System | |
How the Multiplex Works | |
Water Bath Access | |
Service Access | |
Sequence of Operation | |
| |
Placing Equipment in Operation | |
Placing the Carbonation System in Operation | |
Equipment Setup and Close Procedure | |
Equipment Setup Procedure | |
Equipment Close Procedure |
ii | Part Number 020001552 5/11 |