Model 11M Root Beer System Refrigeration Unit
Installation, Use & Care Manual
America’s Quality Choice in Refrigeration
Procedural Notices
Safety Notices
Read These Before Proceeding
PERSONAL INJURY POTENTIAL
Section Installation
Table of Contents continued Section
Attention Marine Installations
Specifications
Equipment Placement
Table of Contents continued
Tower Installation
Connecting Insulated Conduit
Section Before Calling for Service
Table of Contents continued Section Maintenance
Beverage System Cleaning
Bag-In-BoxSystem Sanitation
THIS PAGE INTENTIONALLY LEFT BLANK
Section General Information
How to Read a Model Number
Section
Read This Manual
Specifications
Accessories
ATTENTION MARINE INSTALLATIONS
Special Applications
Serial Plate Location
Warranty Information
Section
Kit assembly includes
Section Installation
General
UNPACKING AND INSPECTING
Dimensions and Clearances
Installation
Top View
Side View
BLADE TOWER
REMOTE CONDENSER
Safe Installation Dos and Don’ts
CLEARANCES
Location Requirements
RATINGS
REQUIREMENTS FOR POST MIX UNITS
SPECIFICATIONS
Installer Instructions
Electrical
Ambient Location Requirement
GROUNDING INSTRUCTIONS
PLUMBING POTABLE WATER
Plumbing/Water Supply
PLUMBING REQUIREMENTS - GENERAL
Drain Hose Connection
Single Tower Plumbing
PLUMBING CIRCUIT DIAGRAMS - MODEL 11M ROOT BEER
Model 11M Root Beer Dual Tower Plumbing
2-10
Model 11M Root Beer Three Tower Plumbing
2-11
EQUIPMENT PLACEMENT
Refrigeration Unit Installation
TOWER INSTALLATION
CONNECTING INSULATED CONDUIT
Connecting conduit at the refrigeration unit
CONNECTING SUPPLY LINES
2-13
Proceed with the Following Tests
Connect the drain
Proper John Guest Fitting Installation
2-14
PROPER USE OF JOHN GUEST FITTINGS
Model 11M Connections
2-15
Control Switches
Aeroquip Connection
Condenser and Pre-chargedLines Installation
2-16
INSULATING CONNECTIONS
2-17
INSTALLING THE MULTIPLEX REMOTE CONDENSER
PRE-CHARGEDREFRIGERATION LINE REQUIREMENTS
TESTING CO2 CIRCUIT FOR LEAKS
CONNECTING THE PRE-CHARGED REFRIGERATION LINES
TESTING SYRUP CIRCUIT 5 GALLON TANKS ONLY
2-18
Preparing Ice Bank
Start-Up
2-19
BUILDING AN ICE BANK
2-20
Installation Checklist
Observe the pump operations for leaks
Check the water bath for full ice bank
Operation
Section Operation
Typical System
Water Filters
SERVICE ACCESS
WATER BATH ACCESS
How the Multiplex Works
Sequence of Operation
EQUIPMENT SETUP PROCEDURE
Equipment Setup and Close Procedure
EQUIPMENT CLOSE PROCEDURE
Start-up
Section
Maintenance
Section Maintenance
BEVERAGE SYSTEM CLEANING
Sanitizing
FIGAL BEVERAGE SYSTEM
Shipping, Storage and Relocation
Back-flowPreventer Maintenance
Section
Before Calling for Service
Section Before Calling for Service
Checklist
Section
Before Calling for Service
THIS PAGE INTENTIONALLY LEFT BLANK
Page
Part Number 020001552 5/11
Related pages
All Install page
Installing as a USB Connected Printer for Dymo SE450
Listed Components for Mobile Home Installation for Regency CS1200
Preparing the rangehood for installation for Fisher & Paykel HS60CSX2
Verifying the Installation on Microsoft Windows Server for HP Host Explorer Software Media Kit
Installing the Software onto a Computer for Polaroid i639
Canadian Installations US Installations for Rheem RMTG-66DV
Removal and Installation of the Power Supply for Logicube Omniclone Xi
To Install Charcoal Filter for GE JVM1750
Installing Gbic Interfaces for Asante Technologies 8000
Installation menu for Mitsubishi Electronics WD570U
How often should I run the self-cleaning feature on my oven?
Find out here
Top
Page
Image
Contents