Manitowoc Ice 11M Connect the drain, 2-14, Proper Use Of John Guest Fittings, Proper Tubing Cut

Page 24
Connect the drain

Installation

Section 2

 

 

Connect the drain

Locate the drain hose, bracket and the two (2) screws provided in the installation kit. Attach the drain hose to the water bath overflow tube located on the bottom of the refrigeration unit. Route drain hose to a floor drain (See Below).

Bracket

PROPER USE OF JOHN GUEST FITTINGS Bottom of

Unit

Screw

Proper Tubing CutDrain Hose

PROPER USE OF JOHN GUEST FITTINGS

NOTE: This unit has a compression type tube connector. The following are step-by-step instructions on how to properly use these fittings. For connecting purposes, all connections are furnished with a 3/8” barb connector.

1.Before inserting tubing into a John Guest fitting, be sure end of tubing is cleanly and squarely cut).

Correct

 

Wrong

 

 

 

Tubing

 

Tubing

 

 

 

Proper Tubing Cut

2.Lubricate O-ring with water. Insert tubing into John Guest fitting. Push tubing firmly through fitting until it rests against the tube stop in the fitting’s main body housing. The tubing is now locked into the John Guest fitting.

3.To release tubing from John Guest fitting, slide collet cover up tube and push in collet. Pull tubing out.

4.Neatly route syrup lines, braided CO2 gas line and the black incoming water line through the inlet opening on the left side of the refrigeration unit. Do not allow any of these lines to rest on the agitator motor or any other surface that may become hot.

5.Attach the black water supply line to the water filter or a filtered water supply. A 3/8” Barb fitting and tab clamp, reducer bushing and 3/8” male pipe x 1/2” OD John Guest tube adapter are provided in the installation kit for making this connection.

6.Route the numbered syrup lines to the syrup supply (syrup tanks, Bag-In-Box, or bulk syrup). Do not attach lines to syrup supply at this time. Lines will be attached to syrup supply after system is tested for leaks.

7.Attach the braided CO2 line with swivel nut to a regulated CO2 supply. Use nylon water provided in installation kit. Note: do not turn ON CO2 supply to system at this time.

8.Connect the conduit lines. Two (2) carbonated water lines and two (2) product output lines (#1 regular rootbeer & #2 diet rootbeer).

Wrong

Tubing

Tube Stop

Collet Proper John Guest Fitting Installation

Collet Cover

Correct

Tubing

Collet 2-14

Manual background Collet Cover

Proper John Guest Fitting Installation

2-14

Part Number 020001552 5/11

Image 24
Contents Installation, Use & Care Manual Model 11M Root Beer System Refrigeration UnitAmerica’s Quality Choice in Refrigeration Safety Notices Procedural NoticesRead These Before Proceeding PERSONAL INJURY POTENTIALTable of Contents continued Section Section InstallationAttention Marine Installations SpecificationsTable of Contents continued Equipment PlacementTower Installation Connecting Insulated ConduitTable of Contents continued Section Maintenance Section Before Calling for ServiceBeverage System Cleaning Bag-In-BoxSystem SanitationTHIS PAGE INTENTIONALLY LEFT BLANK How to Read a Model Number Section General InformationSection Read This ManualAccessories SpecificationsATTENTION MARINE INSTALLATIONS Special ApplicationsWarranty Information Serial Plate LocationGeneral Information Section Installation Kit assembly includesGeneral UNPACKING AND INSPECTINGInstallation Dimensions and ClearancesTop View Side ViewREMOTE CONDENSER BLADE TOWERSafe Installation Dos and Don’ts Location Requirements CLEARANCESRATINGS REQUIREMENTS FOR POST MIX UNITSInstaller Instructions SPECIFICATIONSElectrical Ambient Location RequirementGROUNDING INSTRUCTIONS Plumbing/Water Supply PLUMBING POTABLE WATERPLUMBING REQUIREMENTS - GENERAL Drain Hose ConnectionPLUMBING CIRCUIT DIAGRAMS - MODEL 11M ROOT BEER Single Tower Plumbing2-10 Model 11M Root Beer Dual Tower Plumbing2-11 Model 11M Root Beer Three Tower PlumbingRefrigeration Unit Installation EQUIPMENT PLACEMENTTOWER INSTALLATION CONNECTING INSULATED CONDUITCONNECTING SUPPLY LINES Connecting conduit at the refrigeration unit2-13 Proceed with the Following TestsProper John Guest Fitting Installation Connect the drain2-14 PROPER USE OF JOHN GUEST FITTINGS2-15 Model 11M ConnectionsControl Switches Condenser and Pre-chargedLines Installation Aeroquip Connection2-16 INSULATING CONNECTIONSINSTALLING THE MULTIPLEX REMOTE CONDENSER 2-17PRE-CHARGEDREFRIGERATION LINE REQUIREMENTS CONNECTING THE PRE-CHARGED REFRIGERATION LINES TESTING CO2 CIRCUIT FOR LEAKSTESTING SYRUP CIRCUIT 5 GALLON TANKS ONLY 2-18Start-Up Preparing Ice Bank2-19 BUILDING AN ICE BANKInstallation Checklist 2-20Observe the pump operations for leaks Check the water bath for full ice bankSection Operation OperationTypical System Water FiltersWATER BATH ACCESS SERVICE ACCESSHow the Multiplex Works Sequence of OperationEquipment Setup and Close Procedure EQUIPMENT SETUP PROCEDUREEQUIPMENT CLOSE PROCEDURE Start-upOperation Section Maintenance MaintenanceBEVERAGE SYSTEM CLEANING SanitizingFIGAL BEVERAGE SYSTEM Back-flowPreventer Maintenance Shipping, Storage and RelocationMaintenance Section Before Calling for Service Before Calling for ServiceChecklist Before Calling for Service SectionTHIS PAGE INTENTIONALLY LEFT BLANK Page Part Number 020001552 5/11