Manitowoc Ice manual 2-10, Model 11M Root Beer Dual Tower Plumbing, Installation, Section

Page 20
Model 11M Root Beer Dual Tower Plumbing

Installation

Section 2

 

 

Model 11M Root Beer Dual Tower Plumbing

Installation Kit (020001441)

020001403

00861302

Tee Kit

(020001411)

 

Primary

 

Carb

 

Pump

 

Pressurized

 

Filtered

Carb

Water

Supply

Tank

 

 

Circ

 

Pump

2-10

Part Number 020001552 5/11

Image 20
Contents America’s Quality Choice in Refrigeration Installation, Use & Care ManualModel 11M Root Beer System Refrigeration Unit Safety Notices Procedural NoticesRead These Before Proceeding PERSONAL INJURY POTENTIALTable of Contents continued Section Section InstallationAttention Marine Installations SpecificationsTable of Contents continued Equipment PlacementTower Installation Connecting Insulated ConduitTable of Contents continued Section Maintenance Section Before Calling for ServiceBeverage System Cleaning Bag-In-BoxSystem SanitationTHIS PAGE INTENTIONALLY LEFT BLANK How to Read a Model Number Section General InformationSection Read This ManualAccessories SpecificationsATTENTION MARINE INSTALLATIONS Special ApplicationsWarranty Information Serial Plate LocationTHIS PAGE INTENTIONALLY LEFT BLANK Section Installation Kit assembly includesGeneral UNPACKING AND INSPECTINGInstallation Dimensions and ClearancesTop View Side ViewREMOTE CONDENSER BLADE TOWERSafe Installation Dos and Don’ts Location Requirements CLEARANCESRATINGS REQUIREMENTS FOR POST MIX UNITSInstaller Instructions SPECIFICATIONSElectrical Ambient Location RequirementGROUNDING INSTRUCTIONS Plumbing/Water Supply PLUMBING POTABLE WATERPLUMBING REQUIREMENTS - GENERAL Drain Hose ConnectionPLUMBING CIRCUIT DIAGRAMS - MODEL 11M ROOT BEER Single Tower Plumbing2-10 Model 11M Root Beer Dual Tower Plumbing2-11 Model 11M Root Beer Three Tower PlumbingRefrigeration Unit Installation EQUIPMENT PLACEMENTTOWER INSTALLATION CONNECTING INSULATED CONDUITCONNECTING SUPPLY LINES Connecting conduit at the refrigeration unit2-13 Proceed with the Following TestsProper John Guest Fitting Installation Connect the drain2-14 PROPER USE OF JOHN GUEST FITTINGSControl Switches 2-15Model 11M Connections Condenser and Pre-chargedLines Installation Aeroquip Connection2-16 INSULATING CONNECTIONSPRE-CHARGEDREFRIGERATION LINE REQUIREMENTS INSTALLING THE MULTIPLEX REMOTE CONDENSER2-17 CONNECTING THE PRE-CHARGED REFRIGERATION LINES TESTING CO2 CIRCUIT FOR LEAKSTESTING SYRUP CIRCUIT 5 GALLON TANKS ONLY 2-18Start-Up Preparing Ice Bank2-19 BUILDING AN ICE BANKInstallation Checklist 2-20Observe the pump operations for leaks Check the water bath for full ice bankSection Operation OperationTypical System Water FiltersWATER BATH ACCESS SERVICE ACCESSHow the Multiplex Works Sequence of OperationEquipment Setup and Close Procedure EQUIPMENT SETUP PROCEDUREEQUIPMENT CLOSE PROCEDURE Start-upTHIS PAGE INTENTIONALLY LEFT BLANK Section Maintenance MaintenanceBEVERAGE SYSTEM CLEANING SanitizingFIGAL BEVERAGE SYSTEM Back-flowPreventer Maintenance Shipping, Storage and RelocationTHIS PAGE INTENTIONALLY LEFT BLANK Checklist Section Before Calling for ServiceBefore Calling for Service THIS PAGE INTENTIONALLY LEFT BLANK Before Calling for ServiceSection Page Part Number 020001552 5/11