Contents | 
  | 
ImportantInstallationInformation  | 1  | 
Step 1: Ventilation Requirements  | 2  | 
Step 2: Cabinet Preparation  | 3 – 7  | 
Step 3: Unpacking, Moving  | 
  | 
and Placing the Range  | 8 – 9  | 
Step 4: Installing   | 10 – 11  | 
Step 5: Gas Requirements and Hookup  | 12  | 
Step 6: Electrical Requirements,  | 
  | 
Connection and Grounding  | 13 – 15  | 
Step 7: Backguard Installation  | 16  | 
Step 8: Door Removal and Installation  | 17  | 
Step 9: Burner Test and Adjustment  | 18 - 19  | 
Installer Checklist  | 20  | 
To Clean and Protect Exterior Surfaces  | 20  |