| INSTALLATION | HEAVY DUTY COUNTERLINE |
| Figure 9 |
|
| J | K |
| I | I |
|
| |
INSTALLATION | H |
|
|
| |
|
| J |
|
| L |
| N | L |
|
| |
| O | M |
|
|
7.Check the partially assembled stand to make sure that the legs are straight and that all corners are square. Now tighten all bolts, but do not over tighten.
8.If legs with casters were ordered, lift the stand and screw the caster assemblies into the bottom of the legs. The two casters with
9.If the optional shelf was ordered (item “K”), position it on top of the bottom braces. The
10.Position the front and rear top supports (items “L”) over the legs. The
11.Attach the angle support brackets (item “N”, shipped with the appliance) to the bottom of the of the appliance using #10x1/2" sheet metal screws (item “O”, also shipped with the appliance).
12.Place the appliance on top of the stand, making sure that the angle brackets that you just installed on the bottom of the appliance are inserted into the front and rear top supports. No additional bolts or screws are required. Lift the appliance only at the ends, never in the middle!
13.Go on to Step 4 on page 18.
PAGE 14 | OWNER’S MANUAL 1182845 REV 8 |