Shindaiwa DG250MI, DG150MI specifications During Operation, Post startup check

Page 31

And then adjust the speed by speed control knob and adjust to the No-load revolution.

 

 

 

No-load revolution

50 Hz

Operation

1575 min-1

(52.5 Hz)

60 Hz

Operation

1890 min-1

(63.0 Hz)

<Caution>

By adjusting the speed to the above revolutions, the frequency will be 50Hz or 60Hz.

Lock the Speed Control handle with locknut

<Caution>

Ensure that the speed control handle is surely locked with locknut, otherwise the frequency (engine revolution) may fluctuate.

Adjust to the required voltage by adjusting Voltage regulator.

Turn the circuit breaker to ON position to send power to the load side.

! Danger

:Electrical Shock ￿ Injuries

￿Before turning the circuit breaker to ON position to send power to the load side, always ensure that any circuit breaker and switch of loads are positioned to OFF.

In the case the generator and the load are away from each other, proceed with the above steps, communicating well with the other person by the load in order to prevent from accident.

9.2During Operation

9.2.1Post startup check

￿Make sure that all meters (gauges) and displays are working properly (refer to 5. Equipment)

￿Check for any unusual vibration or noise

￿Check for any unusual color from the exhaust. Under normal condition, the exhaust fume has no color or light bluish color.

<Caution>

If finding out abnormality, consult with the distributor or our engineering section in order to repair, without using the machine.

- 31 -

Image 31
Contents DG150MI DG250MI Table of ContentsIntroduction Injuries Safety GuidelinesSuffocation from exhaust fume Electrical ShockFire Injuries to eyes and skinBurns Location of Warning labels Control Panel Unit Name of Generator SpecificationsSpecification Matrix Alternator EngineAmbient Condition PartsExternal view Name Control panelEquipment Water Temperature Monitoring Lamp for temperature HighMonitor Display Engine Oil Monitoring Lamp for oil pressure low Battery Charge Monitoring Lamp charge lamp Hour Meter GaugesFluid Level Monitoring Lamp DG250MI only Tachometer DG250MI onlyLamp Water Temperature Gauge DG250MI onlyOil Pressure Gauge DG250MI only Generator GaugesSwitch Throttle Handle Fuel Line Changeover Valve 3-way valveVoltage Regulator and Throttle Handle Voltage RegulatorTransportation Transport and InstallationUsing fuel from built-in fuel tank Using fuel from external fuel tankTransportation InstallationSelecting Cable ConnectionElectrical damages Connecting Cable Load Connection Terminal Plate 3-Phase / 1-phase 2.1 200 2 1-Phase Output Terminals & Receptacles2.2 400 Grounding Work Earth Leakage Relay and GroundingEarth leakage breaker relay has activated Operation CheckFire Burns Initialization and pre-checkChecking Engine Oil Electrical Shock InjuriesChecking Coolant / Water Viscosity and temperatureEngine Oil Capacity Checking Coolant reservoir tank / Adding coolant Checking Radiator / Adding waterCondition Checking Fan BeltCoolant Capacity TensionChecking Fuel Replacing the battery Checking BatteryChecking Fuel, Engine Oil, and Water leakage Initializing / preparation OperationPost startup check During OperationAdjustment During operation Stopping the Generator Protection⑥ FeaturesProtection Feature List Connecting to External Fuel TankOverload Turn the lever for 3-way valve to B position MaintenanceGenerator side Oil Filter Change Oil ChangeModel Isuzu Part No Cleaning / Changing Fuel Filter Cleaning / Changing Air Filter ElementChanging Coolant / Water Draining Water from Fuel TankModel Long-term Storage Storage ProceduresStacking TroubleshootingSymptoms Possible Cause Corrective Actions Generator Wiring Diagram Page Page Page Engine Wiring Diagram