ADTRAN T3SU 300 Installation and Operation, UNPACK, INSPECT, POWER UP Receiving Inspection

Models: T3SU 300

1 122
Download 122 pages 32.22 Kb
Page 23
Image 23
Chapter 2 Installation and Operation

Chapter 2 Installation and Operation

UNPACK, INSPECT, POWER UP

Receiving Inspection

Carefully inspect the T3SU 300 for any damage that may have occurred in shipment. If damage is suspected, file a claim immediately with the carrier and contact ADTRAN Technical Support (see the back cover of this manual). Keep the original shipping container to use for future shipment or verification of damage during shipment.

ADTRAN Shipments Include

The following items are included in ADTRAN shipments of the T3SU 300:

T3SU 300 unit

User manual

An 8-position modular to 8-position modular cable (two of these cables are included in the 1200217L1 version)

An 8-position modular to DB-25 female connector

An 8-position modular to DB-25 male connector (1200217L1 version only)

A 4-position modular to 4-position modular cable (1200217L2 version only)

Mounting ears for 19-inch rack installation

Rubber feet for stand-alone use

61200217L1-1

T3SU 300 User Manual

2-1

Page 23
Image 23
ADTRAN T3SU 300 Installation and Operation, UNPACK, INSPECT, POWER UP Receiving Inspection, ADTRAN Shipments Include