remote login 2-8
remote management application 7-7remote payload loopback with BERT test 6-5,6-8
remote port payload loopback test 6-8reset all tests 6-11
return material authorization (RMA) 1-5RL 4-7
RS 4-7
S
save configuration 3-24 secondary phone number 3-20SEFS 5-4
self test 3-22 results 3-23
severely errored framing seconds 5-4single port application 7-1
SLIP 2-5,3-1,3-13
SNMP 1-1,1-2,1-3,2-6,3-14,3-15specifications B-1
SR 3-8,4-7 statistics 5-1 statistics menus 2-8 status
DTE ports 4-5 status information
network port 4-2 status LED 2-9 status menus 2-8,4-1 subnet mask 3-12 system management 3-11
T
T3 overview 1-2 TA 4-6
TD LED 2-10 TDM 1-1
TELNET 1-1,1-3,2-6,3-13 terminal interface
connection 2-6
terminal timeout 3-19 time
setting 3-19 timing
local 3-3 loop 3-3 TM 4-6,4-7
toggle all 3-16 toggle all traps 3-18 TR 3-8,4-7 transmit clock 3-9 trap generation 3-15 trap IP addresses 3-15 traps 3-15
U
UAS 5-4,5-5,5-6 unallocated 75k blocks 3-7 unavailable seconds 5-4 unit ID 3-19 unpacking the unit 2-1updating the unit 3-22 utilities menu 3-22
V
V.35 3-6,3-7,4-5
cable 2-2
card 1-1,1-4,A-3 leads 4-6,4-7
VT 100 3-13 connection 2-6
W
waiting
port status 3-7 waiting for DTE
port status 4-5 warranty 1-5
write community name 3-15