American Power Conversion Central Air Conditioning System manual Semi-AnnualPreventive Maintenance

Models: Central Air Conditioning System

1 84
Download 84 pages 23.05 Kb
Page 71
Image 71
Semi-Annual Preventive Maintenance

Semi-Annual Preventive Maintenance

Photocopy and use the pages in this section during the maintenance procedures and save them for future reference.

Perform all the Monthly/Quarterly Preventive Maintenance items AND the items below.

Prepared by: _________________________________

Model Number: ______________________________

Serial Number: _______________________________

Date: _________________

Cleanliness

*Ensure that the chilled water coil is clean.

Electrical

*Verify that the contactors and relays are operating correctly.

*Check the main power wiring for the following components:

Reheat elements

Evaporator motors

Humidifiers

Functional tests

*Verify the operation of the coil fluid (water regulating) valves: Pressure (PSI) ______________

*Check the operation of all System alarms.