ES45T-T Reflector Assembly

Step 8

Step 9

Step 10

Step 11

Securely attach winch assembly (P/N 39532) to lower portion of azimuth axis support (P/N 49634) using supplied U-bolts, lockwashers and nuts as shown in Figure 74.

Keep winch cable aligned with sheaves

Figure 74

Begin releasing winch cable. Route cable through both sheaves allowing sufficient cable length to reach top of main triangle assembly on reflector backstructure.

Route P/N 43909 or customer-supplied 18-foot (5500 mm) choker assembly behind both pivot brackets of main triangle assembly as shown. Attach end of choker to winch or crane cable hook.

Distance between choker/winch connection and top of main triangle assembly should be approximately 13 inches (330 mm).

Remove small portion of foam padding from reflector packing crate and install under bottom portion of reflector assembly to prevent reflector damage during hoisting proce- dure. Position man at bottom of reflector/backstructure to guide assembly during hoist- ing procedure.

61

Installation Procedures

Page 61
Image 61
Andrew manual ES45T-T Reflector Assembly Step